CT Air conditioning & Electrical Services shop

CT Air conditioning & Electrical Services shop

Share

CT Airconditioner & Electrical service PTY ltd part of TFMG pty ltd are the go to company for all your home, office needs.

All buildings related, we are the expertise in the field. All done by SANS 10400 building regulations.

10/08/2026

💧⚡ Automatic Water Pump Control Wiring
Pressure Switch + Contactor + Overload Relay + Indicator Lamp 🔧

Practical electrical wiring explained simply. ⚡

Photos from CT Air conditioning & Electrical Services shop's post 07/08/2026

GETA 1.5–6K Product Spotlight Part 2 ⚡Smart Energy Management. Flexible Power Solutions.
Beyond reliable solar input, the LuxpowerTek GETA Series delivers intelligent energy management with flexible operation, powerful battery support, and smart monitoring for off-grid applications.

💚 LuxpowerTek — Your Reliable Energy Solution Partner

07/08/2026

The image provides a detailed, labeled exploded view of an air conditioner outdoor unit (condensing unit), breaking down its 13 major physical and electrical components along with a functional workflow description.

06/08/2026

a cross-sectional diagram illustrating the construction of a soffit and eave section of a building, likely a house. It labels various components and their relationship within the roof and wall structure.

Key Components and Their Relationships:

* Soffit: This is the underside of the eave, bridging the gap between the fascia and the wall. It is typically made of wood, vinyl, or aluminum and helps to protect the rafter tails. The diagram points to the soffit as a horizontal piece of material.

* Eaves: The overhanging lower edge of the roof extending beyond the wall of the building. The diagram labels the open space above the soffit as the "Eaves."

* Fascia: The vertical board that caps the ends of the rafters and is nailed to the sub-fascia. It provides a finished appearance and a nailing surface for gutters. The diagram highlights the Fascia as the outermost facing board below the eaves.

* Sub-fascia: A board, usually wood, that's attached directly to the rafter tails. The fascia board is attached to the sub-fascia.

* Gutter: A trough along the eaves designed to collect rainwater and direct it away from the building's foundation through downspouts. The diagram shows the gutter attached to the fascia.

* Rafter Tail: The end portion of the rafter that extends beyond the wall. This part supports the eaves and soffit. The diagram clearly labels the "Rafter Tail" extending from the "Plywood Sheeting"

* Plywood Sheeting: The wooden panels that form the structural covering of the roof. This provides a solid surface for roofing materials. The diagram indicates it is covering the rafters.

* Black Felt Paper: A layer of roofing underlayment, typically asphalt-saturated felt, installed over the plywood sheeting to provide an additional moisture barrier before the installation of shingles or other roofing materials.

* Drip Edge: A metal flashing installed at the edge of the roof to direct water away from the fascia and into the gutters, preventing water damage. The diagram depicts it as bent metal flashing placed under the black felt paper.

* Wall Stud: A vertical framing member within the wall construction. The image illustrates a single stud extending upwards.

* 2 x 4: A wooden framing member used as a brace supporting the soffit.

Overall Structure and Function:

The diagram illustrates how these components work together to form a functional and protective eave and soffit system. The roof (plywood, felt paper, drip edge) sheds water. The gutter collects the water and directs it away. The soffit encloses the underside of the eave, preventing pests and weather from entering the attic and providing a finished appearance. The fascia provides a nailing surface for the gutter and a finished edge.

Visual Style:

The image is a schematic or technical drawing, not a photograph. It uses simple lines and labels to clearly identify the parts and their relationships. The use of color helps to distinguish the different materials.

Purpose:

The diagram is likely intended to educate or inform someone about the construction details of a soffit and eave system. It could be used for instructional purposes, architectural plans, or DIY guides.

06/08/2026

🧱 Block Wall Construction: Thin Joint vs Missing Mortar

A properly constructed block wall depends on complete mortar joints to create a strong, stable, and durable structure. A 1 cm thick mortar joint ensures proper bonding between blocks, distributes loads evenly, and minimizes the risk of cracks. Missing mortar, especially in vertical joints, creates weak points that reduce structural integrity and may lead to water pe*******on, settlement, and premature wall failure.

✅ Best Practices

Use a 10 mm (1 cm) uniform mortar joint.

Fill both horizontal and vertical joints completely.

Maintain a proper staggered bond pattern.

Use a quality mortar mix (commonly 1:4 cement:sand, unless project specifications require otherwise).

Keep walls plumb and aligned during construction.

Cure the masonry for at least 7 days for better strength and durability.

❌ Common Mistakes

Leaving vertical joints without mortar.

Using uneven or excessively thick mortar joints.

Poor bonding between masonry units.

Skipping curing after construction.

Building on an uneven or weak foundation.

Follow us CT Air conditioning & Electrical Services shop

Photos from CT Air conditioning & Electrical Services shop's post 06/08/2026

GETA 1.5–6K Product Spotlight Part 1⚡Compact Design. Powerful Off-Grid Performance.
LuxpowerTek GETA Series is designed to deliver reliable off-grid power with flexible solar input, efficient energy conversion, and an ultra-lightweight design for easier installation.

☀️ Max. PV Input Voltage: 500V
⚡ Max. PV Input Current per MPPT: 18A

From residential backup to off-grid applications, GETA 1.5–6K provides a simple and reliable energy solution built for diverse needs.
👉 Learn more: www.tfmg.co.za
🔔 Stay tuned for Part 2! We'll introduce more powerful features.

💚LuxpowerTek — Your Reliable Energy Solution Partner CT Air conditioning & Electrical Services shop

06/08/2026

CT Air conditioning & Electrical Services shop

02/08/2026

Everyone's fighting about where to build data centers. Communities are pushing back. And honestly? They have a point.

Companies are building massive compute facilities next to farms, on farms and near people.

Here's the thing: data centers don't need to be near people. They need to be near power, cooling, and connectivity.

So why are we cramming them into suburbs when there's a smarter play?

Cold climates change the entire equation:
→ Cooling is the #1 operating cost. In cold regions, free-air cooling can slash energy use dramatically. Nature does the work HVAC systems fight to do everywhere else.
→ Less competition for resources. No fighting local families for water and grid capacity.
→ Abundant renewable potential. Nordic countries are already running data centers on hydro and geothermal — some of the cleanest, cheapest power on earth.
→ Fewer NIMBY battles. Build where the impact on communities is minimal, and you spend less time in permitting hell.

The future of AI infrastructure isn't "build it in everyone's backyard and hope they don't notice."

It's build it where the physics, the economics, AND the community actually win. Iceland. The Nordics. Canada. These aren't edge cases — they're the blueprint.

We have a rare chance to scale compute and keep it away from the people who never signed up to live next to it. Let's stop putting billion-dollar server farms where families are trying to raise kids.

Put them where it makes sense 🧊

Whats your take on data centers? CT Air conditioning & Electrical Services shop

24/07/2026
Want your school to be the top-listed School/college in Cape Town?

Click here to claim your Sponsored Listing.

Location

Telephone

Address


Unit 2 8 Quarry Close Brackenfell Industrial
Cape Town

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00