Facilities Engineering and Planning at Rice University

Facilities Engineering and Planning at Rice University

Share

Facilities Engineering and Planning at Rice University

Rice University's FE&P department is a comprehensive maintenance, project management, and utility operation that encompasses Maintenance, Custodial, Grounds, Engineering, Business Support, Project Management and the Central and South Plants.

01/21/2022

What a beautiful view!

January glows
📷 Brandon Martin

10/13/2021

As the construction for the New Engineering and Science Building is underway, the project will close a portion of the sidewalk for access to Duncan Hall and on the inner loop over three separate time periods beginning Monday, Oct. 18 through Monday, Nov. 8. The closures are necessary in order to make utility connections for the new building. A map is included for reference (below) with the sidewalk closure and dates in red as well as suggested alternate access in green.

Reminder: Please utilize the temporary sidewalks on Campanile Road and the sidewalk to Duncan Hall in order to avoid walking in the middle of vehicular driveways.

Contact Angie Chen ([email protected] or 713-348-6387) with specific questions about this scheduled work.

07/27/2021

Partial Road and Sidewalk Closure on Alumni Drive:

Beginning Wednesday, July 28 through Saturday, July 31, there will be a partial road and sidewalk closure on Alumni Drive between the South Servery and Intramural Field 6. The road is being closed in order to cut in a path for a conduit to serve the new Hanszen Wing. The closure will be from 7:00 am until 4:00 pm each day.

All vehicular traffic will be directed by a flag person. All pedestrian traffic will need to detour through the Wiess and Hanszen College Quads to avoid the area of construction.

A map is shown here with more detailed information. Questions about this scheduled road and sidewalk closure should be directed to Anzilla Gilmore at 713-348-3395 or by email at [email protected].

TRIRIGA Job Aids 07/20/2021

Over the last two years, we've prepared and launched a new integrated work management system, TRIRIGA. TRIRIGA is a management software platform from IBM that includes Space Management, Capital Projects, Operations, and Maintenance modules. Using one system that combines Space, Projects, and Maintenance will allow FE&P greater integration of data and more efficient processes. To learn how to submit a Service Request or Facility Budget Request, click on this page:

TRIRIGA Job Aids IBM Tririga

Construction Alerts 05/07/2021

We've created a way for our campus community to view how some construction projects may impact parking, walking, and living on campus. Make sure to follow:

Construction Alerts Construction

02/18/2021

Our dedicated team has been working non-stop on campus to address issues as they arise. Grateful for this group!

Feb. 13 - Winter Storm Watch Weather Advisory | Emergency | Rice University 02/13/2021

The university and surrounding areas are under a major winter storm watch. It's been quite some time since we've seen snow on campus, but no worries! Our staff are ready to respond and keep our campus residents, facilities, and grounds safe.

Feb. 13 - Winter Storm Watch Weather Advisory | Emergency | Rice University Frigid, life and property threatening winter weather is expected into Thursday, with most severe conditions Sunday night into Tuesday

Photos from The Shepherd School of Music's post 05/21/2020

The new building is incredible! Such progress!

Photos from Rice University EMS's post 03/26/2020

So glad our REMS friends are caring for Shop Cat!

Photos from Facilities Engineering and Planning at Rice University's post 03/04/2020

George R. Brown Hall, 1991:

Cambridge Seven Associates and RWS Architects designed the three-story George R. Brown Hall with Earl Wall Associates of San Diego as laboratory design consultants. Named for the former chairman of the Board of Trustees at Rice George R. Brown, this 107,000 sqft building houses the Wiess School of Natural Sciences.

Want your school to be the top-listed School/college in Houston?

Click here to claim your Sponsored Listing.

Location

Category

Telephone

Website

http://construction.rice.edu/, http://thetools.blog.rice.edu/

Address


6100 Main Street MS 312
Houston, TX
77005

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm