Irma C Gonzalez, Gavilan Community College Trustee Area 7

Irma C Gonzalez, Gavilan Community College Trustee Area 7 Hollister has always been my home.

Proud to serve as Trustee for Area 7, working every day to support students, strengthen programs, and ensure our community has a strong, accessible college for generations to come.

09/07/2026

Study the works of Luis Valdez! Don’t miss your chance to learn about Mexican-American teatro!

THEA 3: El Teatro Campesino
CRN: 11874

• Hybrid class with online content that traces the historical and cultural influences of the El Teatro Campesino theatrical company from its creation in 1965 to the present.

• Reading, viewing and discussing the development of the Chicano (Mexican American) culture in American Society reflected in the works of play wright and director Luis Valdez and El Teatro Campesino (The Farm Worker's Theatre), are the focus of this course.

• Students will read works by writers, hear plays read by actors and view live theatrical productions, films and videos produced by El Teatro Campesino in this class.

• 3-unit course has the option for a letter grade or pass/no pass.

• Taught by instructor Mary Isabel Cruz.

• THEA 3 is transferable to both California State Universities and University of California schools.

Sign up at gavilan.edu

08/31/2026

If you are currently attending Gavilan, please be aware that September 2 is the final deadline to submit your financial aid application to be considered for California State financial aid, including Cal Grants.

Please submit one of the following:
- California Dream Act Application
- Free Application for Federal Student Aid

Access the applications at gavilan.edu/finaid/apply-choose.php

🚧TRAFFIC ADVISORY: US 101/SR 25 Interchange Project🚧 August 31–September 4, 2026Drivers traveling through the US 101/SR ...
08/31/2026

🚧TRAFFIC ADVISORY: US 101/SR 25 Interchange Project🚧

August 31–September 4, 2026
Drivers traveling through the US 101/SR 25 interchange in Gilroy should expect ongoing construction activity next week as crews continue roadway, drainage, electrical, and bridge construction.

What Drivers Can Expect
Construction crews will continue working in multiple areas of the project.
Crews will continue installing electrical equipment, preparing the roadway, and putting in a new irrigation pipe.
Crews will continue preparing and strengthening the road surface before paving.
Southbound 101–Eastbound 25 Connector: Crews will continue building the bridge, including removing temporary supports, finishing the structure, and installing reinforcement for the concrete safety barriers.
SR 25/US 101 Separation: Crews will continue building the new bridge foundations and installing concrete structures that help carry water away from the roadway.
No Lane & Ramp Closures
No specific lane, on-ramp, or off-ramp closures. However, construction is occurring near the southbound US 101/SR 25 ramp area, so drivers should use caution, follow posted signs, and watch for construction vehicles and workers.

Drive Carefully
Drivers are encouraged to:
Slow down and follow posted construction signs.
Watch for construction workers, trucks, and equipment.
Allow extra travel time through the interchange.
Use caution when entering and exiting US 101 and SR 25.
Construction schedules may change due to weather and field conditions.

Project Objectives
- Improve connectivity between US 101 and SR 25
- Improve traffic operations along US 101 and SR 25 with added ramp storage and signals
- Enhance safety within the interchange area by reducing ramp backups onto southbound US 101 and providing improved access for safer merges
- Support the overall future interchange reconfiguration, including US 101 and SR 25 widening, and future SR 152 improvements between US 101 and SR 156

Project Features
- Phase 1 will reconstruct the US 101/SR 25 interchange slightly north of the current interchange.
- Replace the SR 25 two-lane overcrossing with a four-lane overcrossing spanning across US 101
- Increase the length of the southbound US 101 off-ramp to SR 25 to decrease traffic backups onto US 101
- Upgrade the northbound US 101 ramps to improve exit and merging operations
- Install new traffic signals at the ramp intersections to improve traffic flow
- Construct a separated 2-way bikeway between Castro Valley Road and the southbound 101/SR 25 intersection.

Capital Project Update:Security – Gilroy CampusUPDATES• LSRC• Blue emergency phones installed• Access control and interi...
08/11/2026

Capital Project Update:
Security – Gilroy Campus
UPDATES
• LSRC
• Blue emergency phones installed
• Access control and interior/exterior cameras included in project
scope
• Student/Admin Center
• Cameras installed at the entry to campus
• Cameras installed at the Welcome Center and Administration Suite
• Early Learning Center
• Cameras and access control included in project scope
• STEM Center
• Cameras, access control and blue emergency phones included in
project scope
• Next Steps
• Capital Projects is working with vendor on a plan for the rest of the
Gilroy Campus to determine the final project budget

Capital Projects UpdateSTEM CenterUPDATES• DBE working to complete 95% Construction Documentsfor Inc 1 (POT)• Anticipate...
08/11/2026

Capital Projects Update
STEM Center
UPDATES
• DBE working to complete 95% Construction Documents
for Inc 1 (POT)
• Anticipated DSA submittal for Inc 1 (POT) on 9/3
• Full seismic evaluation of Life Science Building
• FF&E programming on-going
• Design team working on Construction Documents for
Inc 2 (STEM) and Inc 3 (LS)
• Underground utility coordination/investigation
underway
PROJECT INFORMATION
• Current Phase: Construction Documents
• Next Milestone: DSA Submission for Inc. 1
• Total Project Budget: $37.2M
• Anticipated Completion: Fall 2028

Capital Projects Update: Library and Student Resource Center (LSRC)UPDATES• Library stack installation 90% complete• Car...
08/11/2026

Capital Projects Update:
Library and Student Resource Center (LSRC)
UPDATES
• Library stack installation 90% complete
• Carpet install 95% complete
• Final building clean in progress
• Punch walks and trainings in progress
• Commissioning in progress
• Concrete pour at Safe Dispersal area complete
• Landscaping nearing completion
• Parking lot paving in progress
• V***r blasting of the hawk stencil at the West
Courtyard complete
• IT network install in progress
• Security system installed, connections and
testing to begin
• Furniture delivery and installation starting 8/10
• Contractor demobilizing from jobsite end of
August
PROJECT INFORMATION
• Current Phase: Construction
• Next Milestone: Close-Out and Project Certification
• Total Project Budget: $66.3M
• Anticipated Completion: November 2026

Board of Trustees Regular MeetingTuesday, August 11, 2026Gavilan College Mission Statement:Through equitable access and ...
08/11/2026

Board of Trustees Regular Meeting
Tuesday, August 11, 2026
Gavilan College Mission Statement:
Through equitable access and comprehensive support in a welcoming inclusive environment, Gavilan College guides students of diverse backgrounds to achieve academically and pursue lifelong learning. We prepare students for transfer success, career advancement, and meaningful community participation......................................................................................................................................
Board of Trustees Regular Meeting
Tuesday, August 11, 2026
Closed Session - 4:00 p.m.
Location: Gavilan College, Gilroy Campus, Social Science Building, SS 111
Open Session - 5:30 p.m.
Location: Gavilan College, Gilroy Campus, Library Room, LI 170......................................................................................................................
Broadcasting
This meeting will be broadcasted, and virtual attendees can only view the meeting from the Zoom Webinar. For public comment, the attendee making a public comment must attend the meeting in person to do so.
Please click the link below to join the webinar:
https://gavilan-edu.zoom.us/j/82113487309
Webinar ID: 821 1348 7309.............................................................................................................................................
The Gavilan Board of Trustees welcomes public comments at meetings. Attendees must be present to make a public comment and will be provided with a form at the meeting to submit notice.

If you have a specific agenda item you would like to speak to, please indicate this on the form, and you will be called on just before the Board taking up that agenda item. An individual may make public comments on a given agenda item only once. Those who wish to address the Board on a non-agenda item may do so during the time designated for general public comments and should also turn in a speaker card at the beginning of the meeting.
Based on Board Policy 2350, public comments will be timed and are limited to 3 minutes per speaker. If there are many speakers on a single item, the Board may further reduce this time and may place a limit on the total time allocated for public comment. Twenty minutes shall be the maximum time for public speakers on a single item, regardless of the number of speakers at any board meeting. At the discretion of the Chair, these time limits may be extended.
Members of the Board may not engage in discussion about items not on the agenda, but we thank you for taking the time to share your views with us.................................................................................................................................
Additional Guidelines Include:
*(Senate Bill 1100 Section 54957.95) This amendment to the Brown Act states that when a member of the public is disruptive, a governing body must warn them that their behavior is disruptive. If the member of the public does not promptly cease their behavior, the governing body's presiding member or their designee may order their removal..............................................................................................................................................
In compliance with the Americans with Disability Act, if you need special assistance to access the Board meeting room or to otherwise participate at this meeting, including auxiliary aids or services, please contact Michelle Jones at [email protected] or 408-848-4711. Notification at least 48 hours prior to the meeting will enable the District to make reasonable arrangements to ensure accessibility to the Board meeting.

Zoom is the leader in modern enterprise cloud communications.

Congratulations to our Board President Alicia Cortez!
08/06/2026

Congratulations to our Board President Alicia Cortez!

We’re proud to celebrate Gavilan College Board President Alicia Cortez, who received the Global Community Innovator Award at Global Tassels’ 12th Annual Founder’s Gala in New York City.

The award honors leaders advancing equity, innovation, and positive social impact. Congratulations, President Cortez, on this well-deserved recognition!

Join us!
07/30/2026

Join us!

Address

505 Fairview Road
Hollister, CA
95023

Alerts

Be the first to know and let us send you an email when Irma C Gonzalez, Gavilan Community College Trustee Area 7 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The School

Send a message to Irma C Gonzalez, Gavilan Community College Trustee Area 7:

Shortcuts

Share

Category