06/08/2026
From the workshop to the launch site π
Packing up the tools and equipment needed for the next stage of testing and preparation.
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Lenoir-Rhyne BEAR Team, College & University, Hickory, NC.
Balloon, Engineering, And, Rocketry Team working on projects that educate those with absolutely no skill towards a better understanding of how things work in the field!
06/08/2026
From the workshop to the launch site π
Packing up the tools and equipment needed for the next stage of testing and preparation.
06/08/2026
Behind the scenes with Payload π§π
From 3D printed components to onboard systems, every piece plays a role in launch success.
More work on the alt bay as we continue preparing for IREC! π
Every adjustment, test, and late work session brings us one step closer to launch day. Excited to see all of the hard work come together in the desert soon.
05/29/2026
Built from late nights, launch days, teamwork, and a whole lot of passion. ππ»
Huge credit to our president, Dr. Summer McGee, for the inspiration behind this sketchbook-style piece that captures what AeroBears is really about β building, learning, creating, and pushing each other higher every step of the way.
Fear the Flight. β€οΈ
05/25/2026
This Memorial Day, we honor and remember those who gave their lives in service to our nation. πΊπΈ
Thank you for your sacrifice, courage, and dedication.
05/22/2026
The IREC countdown begins!
05/19/2026
Weβre getting closer!
05/11/2026
Epoxy and filler is on!
05/11/2026
Finished up a reduction ring to assist with aerodynamics near the fins. Next up: epoxy and filler.
05/04/2026
Kaleigh and Alex soldering wires into the rotary switches on the altimeter bay.