09/04/2026
It was a very hot, but productive week at the Fremont Middle School Storage Shed ( 40'x 60') project. This week the Construction Trades 2 students have set the columns, installed the trusses (with help from FPS Maintenance and C-R Menn Concrete for lending us a telehandler). Installed wall girts and roof perlins, layouted door and window openings and installed various diagonal bracing.