09/12/2025
Delaware City Schools is on the ballot this November 4th for a PI Levy. What's a PI Levy you ask, and is it even necessary?
A PI, or Permanent Improvements, Levy provides vital funding specifically for longterm (5-years or longer) facility improvements. These include roofing repairs, abatement and replacement of flooring for the 1950s, replacing classroom heaters, paving and repairing playgrounds, replacing busses, and more.
A PI Levy cannot be used for day-to-day operational costs (e.g., salaries, utilities, expendable supplies), or to fund the building of new schools.
DCS has been operating on the approximately $2 million a year to complete permanent improvements. This is the same budget as 1989. Since 1989, DSC has added two new buildings, increased the building footprint for all buildings in the district through additions, and has increased the bus fleet size to increase with district growth and demands.
Costs have drastically increased! We all feel it. The cost of a new bus has almost doubled since 2014, roofing replacement (per square foot) has almost tripled since 2018, and replacing unit ventilators (heaters) has more than doubled since 2016.