09/15/2026
We are excited to finally share a project we have been working on the last couple of months. We are building a premier grass training field, and the seed goes in the ground within the week. Swipe through to see the progress we have made.
The goal is to build a high quality grass field made for training. Flat, firm, and well drained so the ball moves cleanly and every touch feels consistent.
The first step was fixing the drainage. That ground has never drained well, so we put in new drain tile to solve it, and now the water moves off instead of sitting on top.
Next came the dirt work. We sprayed the field and disced it to till up the old grass and start getting it level, then disced it a second time to break the ground down further. One more pass will powderize the surface, and then the seed goes in within the week.
The side yard pitch has been running since May, and it was the minimum viable version of this whole idea. Other fields still carry most of our sessions, but this one has picked up more every month.
Follow along to keep up with the progress.