24/08/2025
Quantity Surveyors Pakistan
Quantity Surveying is about Estimation and Costing of Civil Engineering Projects.
Quantity Surveying is broadly concerned with the estimation, planning and control of the cost on construction projects. It cover a wide range of activities including cost estimation, cost planning, value engineering, feasibility studies, cost benefit analysis, life cycle costing and valuation. Efficient and effective utilization of resources (materials, manpower, money) is the main objective of a
24/08/2025
Quantity surveyors are professionals who specialize in measuring and estimating construction costs. They use various techniques to measure quantities from drawings, including:
1- Take-off: Quantity surveyors use the take-off method to measure quantities from drawings by taking off the dimensions of the various elements in the drawing. This involves identifying the different parts of the drawing and recording their dimensions, such as the length, width, and height. They then calculate the quantities of each element based on the dimensions and specifications provided.
2- Counting: Quantity surveyors also count the number of items or components in the drawing to measure quantities. For example, if the drawing shows a building plan, the quantity surveyor may count the number of doors, windows, and light fixtures to determine the quantity of each item required.
3- Area calculation: Quantity surveyors also use area calculations to measure quantities from drawings. They calculate the area of different sections in the drawing, such as the floor area, wall area, or roof area, to estimate the quantities of materials required.
4- Volumetric calculation: Quantity surveyors use volumetric calculations to measure quantities for projects that involve excavation or filling. They calculate the volume of the material to be excavated or filled based on the dimensions provided in the drawing.
Overall, quantity surveyors use a combination of these techniques to measure quantities from drawings accurately. They also consider other factors such as material wastage, labor, and equipment costs to provide estimates that reflect the actual cost of the project.
5 Tips to Learn Quantity Surveying Basics-
Tip 1: Deep Dive into the Scope
Tip 2: Thorough Drawing Study & Going Beyond it
Tip 3: Keep it Simple & Consistent
Tip 4: Follow the Code
Tip 5: Present to the World
20/12/2022
Calculation of Asphalt Base Course (ABC)
13/07/2022
Different shaoes calculation formula
27/03/2022
LAP LENGHT AND JOGGLE LENGHT
27/03/2022
ILLNESS IN RCC
27/03/2022
Cantilever Beam
26/03/2022
Reinforcement standard hooks
20/02/2022
SHEAR AND STEP CRACK...
Click here to claim your Sponsored Listing.
Location
Category
Contact the school
Telephone
Website
Address
Islamabad
44000