09/01/2024
Protection Coordination study
-is an electrical analysis/study for the determining the setting of protective relays and circuit breakers.
Project Below is a power system study which includes the Protection coordination study of a 34.5kV MVSG with a capacity of 25MVA (consisting of 5-5MVA) Power Transformer.
This Project Includes the Protection Coordination Study of the existing MVSG, LVSG and the additional LVSG along with the Relay Testing and the adjustment of Relay Setting due to additional Loads.
23/08/2023
Since we have been out for almost a month due to prior commitments. Now... we are back again to have some discussion EEngineering Life.
We will upload Under In our discussion series about circuit breakers
For today's discussion is.....
What Happens Inside the circuit breaker after encountering a short circuit fault?
https://youtu.be/lJeafP8C_1o
17/04/2023
1 day RIDGID product Training.
13/04/2023
Topic you may interested. See description for the link.
Link here: https://www.youtube.com/
09/04/2023
Inspection of Double Ended low voltage switchgear (LVSG).
👷⚡️
03/04/2023
Illumination design and study for skyway project.
👷⚡️
02/04/2023
Understanding the Lightning Protection System is available on our YouTube Channel for Design | Installation | Testing discussion.
Here's the Link.
https://youtu.be/rZ8USR9f0WE
01/04/2023
ESE Type Lightning Air terminal Testing
31/03/2023
Essential Lightning Protection System Testing