Civil Engineer's Loksewa Preparation

Civil Engineer's Loksewa Preparation Common learning forum for competitive exams for civil engineers. Invite your laborious friends to discuss tough question and get well prepared.

Notes for PSC preparation are available in link below:
27/08/2022

Notes for PSC preparation are available in link below:

1 file sent via WeTransfer, the simplest way to send your files around the world

How many of you are interested to attend the demo online objective test of LOKSEWA EXAM IN CIVIL ENGINEERING. Interested...
27/01/2021

How many of you are interested to attend the demo online objective test of LOKSEWA EXAM IN CIVIL ENGINEERING. Interested guys encourage your potential competitors to participate along with you and know your probable rank with the competitors. If we see many interests, we will soon organize similar online tests, for which results will be published online on this same page.

पत्र : - प्रथम बिषय : - सिभिल इन्जीनियरिंग सम्बन्धि वस्तुगत बहुउत्तर Click the correct bubble. (Time 45 Seconds for each question)

Result of today's online test.
03/10/2018

Result of today's online test.

https://goo.gl/forms/9MtFIcf1ce89x8mD2Use this link exact at 8:00 PM. It opens only at time.There are 30 questions in to...
03/10/2018

https://goo.gl/forms/9MtFIcf1ce89x8mD2

Use this link exact at 8:00 PM. It opens only at time.
There are 30 questions in total. Total time is 25 minutes.
NO NEGATIVE MARKING

पत्र : - प्रथम बिषय : - सिभिल इन्जीनियरिंग सम्बन्धि वस्तुगत बहुउत्तर Click the correct bubble. (Time 45 Seconds for each question) Total time = 30*45 +2.5 = 25 minutes

Demo for online test is ready.Try this and get used-to the test format.
03/10/2018

Demo for online test is ready.
Try this and get used-to the test format.

पत्र : - प्रथम बिषय : - सिभिल इन्जीनियरिंग सम्बन्धि वस्तुगत बहुउत्तर Click the correct bubble. (Time 45 Seconds for each question)

30/09/2018

The pitch of the main bars in a simply supported slab, should not exceed its effective depth by
a. three times
b. four times
c. five times
d. six times
e. seven times

30/09/2018

The measurements is not made in square meters in case of
a. D.P.C(damp proof course)
b. Form works
c. Concrete Jaffries
d. R.C. Chajja

30/09/2018

The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
a. 1.00 cum
b. 2.00 cum
c. 3.00 cum
d. 4.00 cum

30/09/2018

For 12mm thick cement plastering 1:6 on 100 sq.m new brick work, the quantity of cement required is
a. 0.200 m^3
b. 0.247 m^3
c. 0.274 m^3
d. 0.295 m^3

30/09/2018

Current ratio is:
a. current assests/ Current liabilities
b. current assests+loans/Current liabilities
c. Current asset+loans advances/current liabilities
d. None of these

27/09/2018

We are going to conduct online model test on PSC format on October 3, 2018 @ sharp 8:00 pm.

Those who are interested to appear the exam can request for the personal unique code (PUC) to attend the exam through private message to this page. This code will be used to publish the result (not ur name). PUC will be privately messaged you on October 3, Till then u can send request.

Those who have the code will be provided with the exam link that opens on above date and time.

Address

Baneshwor
Kathmandu

Website

Alerts

Be the first to know and let us send you an email when Civil Engineer's Loksewa Preparation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The School

Send a message to Civil Engineer's Loksewa Preparation:

Shortcuts

Share

Category