16/05/2026
IECEX by TSIM
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from IECEX by TSIM, Education, No 16-, Jalan Lembing 2, Tangga Batu Permai, Malacca City.
At TSIM Ex,We are dedicated to providing top-tier training and cert for profesnal working in explosive area.Wth years of exprnce & deep understanding of IECEx standards,We empower individuals & orgzntion to meet the highest safety & compliance benchmarks.
16/05/2026
3 SLOT TERAKHIR! 🚨 Siapa yang join kelas Sabtu & Ahad ni (16-17 Mei), bukan setakat dapat ilmu, tapi korang akan dapat souvenir eksklusif yang best menanti korang! Siapa cepat, dia dapat gift ni. Jom lock tempat sekarang! 🎁✨
09/05/2026
06/05/2026
Master Hazardous Area Safety: IECEx CoPC Training 2026
Ready to elevate your expertise in the hazardous area industry? Join our IECEx CoPC Training 2026 and gain the globally recognized skills that top companies demand.
This intensive 4-day program bridges the gap between theory and real-world application, featuring hands-on sessions with compliant equipment and international standards.
Training Details:
Dates: 14–17 May, 2026
Location: Tangga Batu, Melaka, Malaysia
Format: 4-Day Intensive (Theory, Practical, and Exam)
Why Enroll?
Global Certification: Earn a credential recognized worldwide.
Career Growth: Significantly increase your professional market value.
Practical Experience: Learn using industry-standard, compliant equipment.
Networking: Connect with fellow experts and industry peers.
Secure Your Spot
Positions are limited and filling quickly. Invest in your professional future today.
For detailed information and registration:
Email: [email protected]
WhatsApp/Call: https://wa.me/601113399479
05/05/2026
For more details
Call now : 01113399479
Intake now open for May
IECEx CoPC slot limited
Click the link below for more details
WhatApps: https://wa.me/601113399479
02/05/2026
Call now for more details
WhatsApp number 01113399479
Limited slots Available
20/04/2026
CHILLER HOOK-UP PIPING STANDARD⚙️⚙️‼️‼️✅✅👇🏼👇🏼
INSTALLATION (HVAC)
Proper chiller piping ensures stable flow, vibration isolation, and equipment protection. A correct hook-up improves efficiency and increases chiller life.
Inlet Line (Return from Building)
Eccentric Reducer - avoids air pockets
Flexible Joint - vibration isolation
Pressure Gauge - monitor pressure
Thermostat / Sensor - temperature monitoring
Isolation Valve - maintenance shutdown
Outlet Line (Supply to Building)
Reducer - pipe size matching
Flexible Joint - vibration isolation
Pressure Gauge - monitor pressure
Thermostat / Sensor - leaving temp control
Flow Switch - ensures water flow
Motorized Isolation Valve (Optional)
Double Regulating Valve (Optional - balancing)
Why Proper Chiller Hook-up?
Protects chiller evaporator
Maintains constant flow
Reduces vibration transfer
Improves system balancing
Easy maintenance isolation
Ensures safe operation
Used In:
Chiller Plant |
District Cooling |
HVAC Central Plant |
Commercial Buildings |
Hospitals
Engineering
Services
Salam Aidil Fitri Al Mubarak
Salam Lebaran Karim
raya rayàaaaaaaaaaaaa
゚viralシfyp
Salam Lebaran 2026
Selamat menyambut lebran dan ceria selalu bersama orang2 tersayang
Semoga semua amal ibadah dibulan ramadan diterima olehnya.. Amin.. ゚viralシ
Click here to claim your Sponsored Listing.
Location
Category
Website
Address
No 16-, Jalan Lembing 2, Tangga Batu Permai
Malacca City
76400