16/07/2026
CONTROL OF HAZARDOUS ENERGY WITH LOTOTO SAFE PROCEDURE
A machine may appear switched off, but electrical, pneumatic, hydraulic, mechanical, thermal, gravitational and stored energy can remain active. One uncontrolled energy release during servicing or maintenance may result in serious injury, equipment damage or operational disruption.
This practical training guides participants through the correct Lock Out, Tag Out and Try Out (LOTOTO) process—from identifying hazardous energy sources and establishing isolation points to applying locks and tags, releasing stored energy and verifying a true zero-energy state.
Participants will strengthen their ability to:
✓ Understand the purpose and application of LOTOTO
✓ Identify hazardous and stored energy sources
✓ Perform systematic equipment isolation
✓ Apply locks, tags and isolation devices correctly
✓ Conduct Try-Out verification safely
✓ Release or restrain residual energy
✓ Understand authorized personnel responsibilities
✓ Confirm zero-energy status before work begins
The expected result is a more disciplined maintenance workforce, stronger procedural compliance and improved protection against unexpected energization, equipment movement or hazardous energy release.
Continuous safety improvement begins when every isolation is planned, verified and treated as a life-critical control.
BOOK YOUR SEAT NOW
Date: 14–15 October 2026
Time: 9.00 a.m.–5.00 p.m.
Venue: Iconic Hotel, Bukit Tengah, Penang
Capacity: Maximum 25 participants
Contact: Ms. Kuga – 016-445 1175
Program No.: 10001653661
Public HRD Claimable Course – SBL Khas