Energy and plumbing construction, plumbing materials import
Эрчим хүч сантехникийн угсралт, Сантехникийн материалын импорт худалдаа.
IMPLEMENTED WORKS AND ACTIVITIES:
1. In 2006-2009, configuration of external and internal pipes and mixing loop, installation of solid fuel boilers of Pelco company of Canada, installation of purifying device of drainage and mixing pump of heating and hot tap water boiler (1gcal), plate heat exchanger unit of heating (4.7 gcal) and installation of ventilation system for the Construction of 5 star
Terelj Hotel of the Terelj LLC in Nalaikh District.
2. In 2006-2013, Installation of plate heat exchanger unit (2 gcal) of central office of Gatsuurt LLC, heating pipes of garage building and warehouse, plate heat exchanger of depot #2 and heating pipes of garage building and desk room building of the Central Office of Gatsuurt LLC.
3. In 2007-2008, Installation of heating (1.48 gcal) and hot water (1.48 gcal) PHE units for the construction of 88-family apartment by the Arrow LLC in Bayanzurkh district.
4. In 2007-2008, configuration of heating pipe with Ǿ300 in the outside area of Bayanmongol district Apartment in Bayanzurkh district.
5. In 2007-2008, Installation of external heating pipe with Ǿ219, Heating (2gcal) and hot water PHE units (0.4gcal) for 4 warehouses of Khuns Trade LLC.
6. In 2007, installation of internal and external heating and utilization hot water lines for the Olympic School.
7. In 2008, installation of heating 0.48gcal, hot tap water 0.3gcal PHE units, water supply Booster pump system and internal water sewerage lines for the Altai construction Building which was built in the territory of Sukhbaatar district.
8. In 2008, installation of internal water sewerage and heating PHE unit (mixing loop of 0.3 Гкал) as well as installation of hardware for the studio illumination and outer address for the Mongol TV Broadcasting.
9. In 2006-2010, Installation of electric water boiler, heating PHE unit of the shower building (PHE units of 1.7gcal heating, hot tap water of 1.0gcal, water supply pressure booster pump system), internal water sewerage pipes and two pieces of DZL heating furnace with 1.4 ton for the construction of desk room, resting room of workers and cafeteria of Bayandulaan LLC in Tsagaannuur Soum, Selenge province.
10. In 2008, Installation of heating and mixing loop for the garage for Sukhbaatar soum of Selenge province.
11. In 2009, Installation of PHE units heating of 2.8gcal, hot tap water of 1gcal and mixing loop ( 0.3gcal ) as well as installation of water sewerage and internal and external heating lines for the construction of factory, garage and office building by the Gatsuurt Agro LLC in Darkhan city.
12. Installation of PHE units for heating/ 2.0gcal / and hot tap water /2.0gcal/, water supply pressure booster pump system for the Apartments Construction of Sumber Ord LLC in 2009.
13. Installation of PHE units for heating /1.0gcal/and hot tap water /1.2gcal/ for the Construction of Mongol Tamkhi So LLC in 2010.
14. Installation of set of equipment for heating and hot water for the Construction of 35-family apartment of Saikhan Bulgan LLC in Khoroo#1, Khan-Uul district in 2010.
15. In 2011, Installation of PHE units heating 0.8 gcal, hot tap water 0.3gcal, and pressure boosting pump system) and internal water sewerage and heating assembly work for the construction of Express Tower which is being build in the territory of Sukhbaatar district.
16. In 2011-2012, Configuration of internal heating pipes and water sewerage lines for Altai House Town Apartment in Khan – Uul district.
17. In 2011-2012, Installation of water sewerage pipes (pure water: 159Ǿ, 130 m and drainage: Ǿ 200-250, 450 m) dual piping (Ǿ 159, 650m) in the outside area, heating PHE unit (0.7 gcal), hot tap water PHE unit (0.4 gcal), ventilation PHE unit 0.3gcal and PHE unit of swimming pool of the British School located in Artsat mountain pass in Khan-Uul district.
18. In 2012, within a frame of installation of PHE units in the Water and Heat Conduction Station in Baganuur district, implemented following works including PHE unit with capacity of 6gcal for WHCS#1, PHE unit of 5gcal for WHCC#2, PHE unit of 1.6 gcal for WHCS#3, PHE unit of 4gcal for WHCC#5, heat conducting pipe with DN150 mm for circuitry#1 of WHCC#3 as well as the renovation of heating pipes with Ǿ76mm for the building#710, 711, 712, 714 of the Uurkhaichid Town Apartment.
19. In 2013 – Configuration of 1 gcal heating PHE unit, internal and external plumbing work for the Green House 48-family Town Apartment for teachers and personnel of the British School of Ulaanbaatar city.