17/11/2023
Well testing Veal veng
- Geotechnical Investigations
- Exploration Geophysics
- Geotechnical Geophysics - MASW - GPR - SE
New Zealand , South East Asia- Vietnam, Cambodia, Singapore, Hong Kong Asia +85510 863111
17/11/2023
Well testing Veal veng
04/11/2023
Geotech in jungle
22/10/2023
Project development - Pursat Cambodia... Groundwater and Geotechnical investigation
Low downward movement and good recovery
One of the key findings from the production tests was the remarkably low downward movement of the water levels in the wells during pumping. This indicates that the aquifer, from which the water is sourced, has a high capacity for replenishment. After the pumping stopped, the water levels in the wells quickly rebounded, indicating a robust ability of the aquifer to recharge itself. This bodes well for the long-term reliability of the water source, as it suggests that even during periods of high demand, the wells can recover and continue supplying water without depletion.
In Short
The discovery of this abundant water source holds immense promise for the town's water supply scheme. With a reliable and plentiful water source now within reach, the potential for expansion and improvement is boundless
20/10/2023
Exploration and Test Well Drilling
The Initial Exploration Process
To unlock abundant water resources for the town, an extensive exploration process was undertaken. This involved careful planning and detailed analysis of the local geological formations to identify potential sources of water. The first step in this process was conducting a thorough survey of the area to determine the most suitable location for drilling test wells.
channel aquifer
Drilling the Test Well
Once the ideal site was identified, the drilling of a test well commenced. This involved using specialized equipment to bore into the channel formations beneath the ground. The test well was designed to provide valuable data about the water availability and quality in the area. The drilling process itself was a complex operation that required skilled profession
20/10/2023
A Case Study on Town Water Supply :
Unlocking Abundance
The existing town system has its fair share of limitations and insufficiency. Firstly, the quantity of water extracted from these wells is insufficient to meet the ever-increasing demands of the growing population. As the town expands, more households, businesses, and infrastructure require access to clean and reliable water, stretching the capacity of the current system to its limits. Additionally, the quality of water obtained from the local wells is not always up to the desired standards. To address these issues and unlock abundant water resources, the town embarked on an ambitious exploration and drilling project
Water well development
12/06/2022
Well field development
VEED - 20220420_180435 Make stunning videos with a single click. Cut, trim, crop, add subtitles and more. Online, no account needed. Try it now, free. VEED
14/05/2022
Operations in Singapore.. Covid seems ok nowadays
29/10/2021
Ground radar mapping. Site service
Gridded survey.. Create 3d block image to better correlate features