Tunnelling Association of Kenya

Tunnelling Association of Kenya Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Tunnelling Association of Kenya, Nairobi.

The Tunnelling Association of Kenya brings together professionals from all disciplines in the planning, design, construction and management of tunnels and underground infrastructure to share ideas, cutting edge technologies and to promote innovation.

Thwake Dam - River diversion tunnels. Twin horse shoe shape, concrete lined tunnels 731 and 797m long 12m diameter. Meth...
06/12/2020

Thwake Dam - River diversion tunnels. Twin horse shoe shape, concrete lined tunnels 731 and 797m long 12m diameter. Method of excavation, drill and blast.
Photo credits

The Northern Collector Tunnel Phase 1 Project. 11.7km long, 4m excavated dia, 3m internal finished dia. Mixed face groun...
06/12/2020

The Northern Collector Tunnel Phase 1 Project. 11.7km long, 4m excavated dia, 3m internal finished dia. Mixed face ground conditions. Drill and Blast & Roadheader excavation. NATM. Fully lined cast in-situ secondary support.
Photo credits

26/11/2019
26/11/2019

The Tunnelling Association of Kenya brings together professionals from all disciplines in the planning, design, construction and management of tunnels and underground infrastructure to share ideas, cutting edge technologies and to promote innovation.

Address

Nairobi

Alerts

Be the first to know and let us send you an email when Tunnelling Association of Kenya posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The School

Send a message to Tunnelling Association of Kenya:

Shortcuts

Share