VDC Engineers

Call Directions Website

VDC Engineers πŸš€ Welcome to V.D.C.

ENGINEERS πŸš€
(Building Information Modelling / BIM)

We are a Digital Engineering, BIM Training & Consulting organization dedicated to preparing Engineering Students and Working Professionals for the future of the AEC Industry.

πŸ—οΈ 026 | BIM & DIGITAL DELIVERY INSIGHTS A CLOSED ISSUE NEEDS EVIDENCE β€” NOT JUST A STATUS CHANGEChanging an issue from ...
02/10/2026

πŸ—οΈ 026 | BIM & DIGITAL DELIVERY INSIGHTS
A CLOSED ISSUE NEEDS EVIDENCE β€” NOT JUST A STATUS CHANGE
Changing an issue from β€œOpen” to β€œClosed” does not prove that the problem has actually been resolved.
A reliable BIM coordination / QA/QC process should demonstrate:
βœ… What was the original issue?
βœ… Who was responsible?
βœ… What corrective action was taken?
βœ… Was the model or information updated?
βœ… Was the correction re-checked?
βœ… Does it now meet the requirement?
βœ… Is there evidence supporting closure?
A stronger workflow is:
ISSUE β†’ ASSIGN β†’ CORRECT β†’ EVIDENCE β†’ VERIFY β†’ ACCEPT β†’ CLOSE
Useful closure evidence may include:
Model view / screenshot β€’ revised information container β€’ issue reference β€’ revision/status β€’ checker comments β€’ verification result
The principle is simple:
STATUS β‰  EVIDENCE
An issue is not truly closed because someone clicked β€œClose.”
It should be closed because the agreed correction has been implemented, verified and accepted.
πŸ“˜ ISO 19650 CONTEXT
ISO 19650-4:2022 defines detailed processes and decision criteria for information exchanges, with the objective of assuring the quality of the resulting PIM or AIM.
The current ISO 19650-2:2018 remains published, while the developing Edition 2 strengthens review and acceptance against Level of Information Need, acceptance criteria and fitness for purpose.
πŸ’‘ KEY MESSAGE
Closing the status is administrative.
Verifying the correction is quality assurance.
NO EVIDENCE β€’ NO VERIFICATION β€’ NO TRUE CLOSURE
πŸ’¬ Does your coordination workflow require evidence before an issue can be closed?

πŸ—οΈ 025 | BIM & DIGITAL DELIVERY INSIGHTSNOT EVERY CLASH IS A DESIGN PROBLEMClash-detection software identifies potential...
01/10/2026

πŸ—οΈ 025 | BIM & DIGITAL DELIVERY INSIGHTS

NOT EVERY CLASH IS A DESIGN PROBLEM

Clash-detection software identifies potential conflicts. But every result should be reviewed and classified before corrective action is assigned.

A detected clash may be:

βœ… Hard Clash β€” two physical elements occupy the same space

βœ… Clearance Issue β€” required access, maintenance or safety space is violated

βœ… Modelling Issue β€” duplicate, misplaced or incorrectly modelled elements

βœ… Workflow / Information Issue β€” wrong revision, coordinates, links or model status

βœ… Accepted Condition β€” a known condition within agreed tolerances that requires no redesign

That is why good coordination should follow:

DETECT β†’ TRIAGE β†’ CLASSIFY β†’ DECIDE β†’ ASSIGN β†’ RESOLVE β†’ VERIFY

Simply reducing the clash count is not the objective.

The objective is to identify which issues require action, who owns them, and whether the agreed resolution has been verified.

πŸ“˜ ISO 19650 CONTEXT

ISO 19650 does not define clash categories. Its relevance is managing reliable information through coordinated production, checking, review, authorisation, and acceptance. ISO 19650-4:2022 provides processes and decision criteria for information exchanges to support PIM/AIM quality.

πŸ’‘ KEY MESSAGE

A clash result is not automatically a design defect.

DETECT FIRST β€’ UNDERSTAND SECOND β€’ ACT WHERE REQUIRED

πŸ’¬ Does your coordination process classify clashes before assigning them for correction?

024 | BIM & DIGITAL DELIVERY INSIGHTSCLASH DETECTION IS NOT COORDINATIONFinding a clash is only the start of coordinatio...
28/09/2026

024 | BIM & DIGITAL DELIVERY INSIGHTS

CLASH DETECTION IS NOT COORDINATION

Finding a clash is only the start of coordination.

Software can identify that a duct intersects a beam, a pipe violates a clearance zone, or two systems occupy the same space.

But the software does not automatically decide:

βœ… Is the clash valid?
βœ… What is its project impact?
βœ… Which discipline owns the issue?
βœ… What solution should be adopted?
βœ… Has the model been corrected?
βœ… Has the correction been verified and closed?

A stronger coordination workflow is:

DETECT β†’ REVIEW β†’ ASSIGN β†’ RESOLVE β†’ VERIFY β†’ CLOSE

Effective BIM coordination therefore combines:

MODEL COORDINATION

Federation β€’ Clash detection β€’ Clearance β€’ Interface review with

INFORMATION MANAGEMENT

Ownership β€’ Status β€’ Decisions β€’ Evidence β€’ Traceability β€’ Closure

πŸ“˜ ISO 19650 CONTEXT

ISO 19650 is not a clash-detection standard.

ISO 19650-4:2022 establishes processes and decision criteria for controlled information exchanges to support the quality of the resulting PIM or AIM. ISO

The developing ISO/DIS 19650-2 Edition 2 describes information production as including coordination, checking, review, approval, authorization and acceptance, supported by the CDE workflow.

πŸ’‘ KEY MESSAGE

Clash detection finds conflicts.

Coordination delivers resolved and verified decisions.

DON’T JUST COUNT CLASHES β€” MANAGE THEM TO CLOSURE.

πŸ’¬ On your projects, are clashes simply reportedβ€”or tracked through ownership, resolution and verified closure?

πŸ—οΈ 023 | BIM & DIGITAL DELIVERY INSIGHTS PASS / FAIL IS NOT ENOUGH β€” BIM QA/QC NEEDS TRACEABLE EXCEPTIONSAutomated check...
25/09/2026

πŸ—οΈ 023 | BIM & DIGITAL DELIVERY INSIGHTS

PASS / FAIL IS NOT ENOUGH β€” BIM QA/QC NEEDS TRACEABLE EXCEPTIONS

Automated checking can tell us that information passes or fails a rule.

But professional BIM QA/QC must also answer:

What failed? Why? Who owns it? What action is required? Was it corrected and verified?

A useful exception record should capture:

βœ… Requirement / rule checked
βœ… Issue or non-compliance identified
βœ… Responsible owner
βœ… Corrective action
βœ… Status and due date
βœ… Evidence of resolution
βœ… Re-check / verification
βœ… Approved acceptance or closure

A stronger workflow is:

CHECK β†’ IDENTIFY β†’ ASSIGN β†’ CORRECT β†’ VERIFY β†’ ACCEPT β†’ CLOSE

An exception should never disappear simply because a model was updated.

It needs a traceable path from identification to controlled closure.

πŸ“˜ ISO 19650 CONTEXT

ISO 19650-4:2022 defines detailed processes and decision criteria for information exchanges to support the quality of the resulting PIM or AIM.

The developing ISO/DIS 19650-2 Edition 2 also emphasizes review and acceptance against the required Level of Information Need, acceptance criteria and fitness for purpose. It remains under development; ISO 19650-2:2018 is still the current published standard.

πŸ’‘ KEY MESSAGE

PASS / FAIL identifies the result.
Traceability manages the resolution.

NO ISSUE SHOULD BE CLOSED WITHOUT EVIDENCE AND VERIFICATION.

πŸ’¬ Does your BIM QA/QC process track failed checks through correction and verified closure?

πŸ—οΈ 022 | BIM & DIGITAL DELIVERY INSIGHTS  AUTOMATED BIM CHECKING IS MORE THAN CLASH DETECTIONClash detection checks whet...
24/09/2026

πŸ—οΈ 022 | BIM & DIGITAL DELIVERY INSIGHTS

AUTOMATED BIM CHECKING IS MORE THAN CLASH DETECTION

Clash detection checks whether model elements physically interfere.

But a BIM model can be clash-free and still contain poor or incomplete information.

Automated BIM checking can go further by validating:

βœ… Required properties and parameters
βœ… Classification and naming rules
βœ… Level of Information Need (LOIN)
βœ… Missing or incomplete asset data
βœ… Model and information consistency
βœ… Geometric and coordination rules
βœ… Acceptance criteria before information exchange

A stronger QA/QC workflow is:

REQUIREMENTS β†’ RULES β†’ AUTOMATED CHECK β†’ REVIEW β†’ CORRECT β†’ ACCEPT

πŸ“˜ STANDARDS CONTEXT

ISO 19650-4:2022 focuses on the process and decision criteria for information exchanges so that the resulting PIM or AIM meets the required quality.

ISO 7817-1:2024 provides the methodology for defining the required Level of Information Need.

buildingSMART IDS allows information requirements to be expressed in a computer-interpretable form and supports automated checking of IFC data.

πŸ’‘ KEY MESSAGE

Clash Detection checks geometry.
Automated BIM Checking checks compliance with defined requirements.

A CLASH-FREE MODEL IS NOT NECESSARILY A QA-COMPLETE MODEL.

πŸ’¬ What do you automate today β€” only clashes, or also information quality?

πŸ—οΈ 021 | BIM & DIGITAL DELIVERY INSIGHTSAI CAN CHECK THE MODEL β€” BUT WHAT SHOULD IT CHECK AGAINST?AI and automated model...
21/09/2026

πŸ—οΈ 021 | BIM & DIGITAL DELIVERY INSIGHTS

AI CAN CHECK THE MODEL β€” BUT WHAT SHOULD IT CHECK AGAINST?

AI and automated model-checking tools can identify missing information, inconsistencies and potential issues.

But automation is only useful when the requirements are clearly defined first.

A reliable BIM QA/QC process should check information against:

βœ… Information requirements & intended purpose
βœ… Level of Information Need (LOIN)
βœ… Required properties and classifications
βœ… Naming and data standards
βœ… Geometric / coordination rules
βœ… Acceptance criteria
βœ… Approved reference information

A better workflow is:

REQUIREMENTS β†’ RULES β†’ AUTOMATED CHECK β†’ HUMAN REVIEW β†’ ACCEPTED INFORMATION

buildingSMART IDS 1.0 enables information requirements to be expressed in a computer-interpretable form so IFC data can be automatically validated. Importantly, IDS focuses mainly on alphanumerical information requirements; it does not replace detailed geometric or design-rule checking.

ISO 7817-1:2024 provides the methodology for defining Level of Information Need, while ISO 19650-4:2022 addresses controlled information exchange and the quality of information contributing to the PIM and AIM.

πŸ’‘ KEY MESSAGE

Don’t ask AI: β€œIs the model correct?”

Ask:

β€œIs the model compliant with the defined requirements?”

AI assists β€’ Rules check β€’ Humans approve

πŸ’¬ Are your BIM requirements structured well enough to be checked automatically?

πŸ—οΈ BIM & DIGITAL DELIVERY INSIGHTS | 020COBie IS NOT THE AIMCOBie is valuable for digital handover β€” but COBie itself is...
17/09/2026

πŸ—οΈ BIM & DIGITAL DELIVERY INSIGHTS | 020

COBie IS NOT THE AIM

COBie is valuable for digital handover β€” but COBie itself is not the Asset Information Model (AIM).

COBie (Construction-Operations Building information exchange) provides a structured way to exchange asset information such as:

βœ… Spaces & systems
βœ… Maintainable assets
βœ… Asset identification
βœ… Manufacturer / product information
βœ… Documents & maintenance-related data

COBie can be delivered in structured formats including SpreadsheetML, JSON and IFC, depending on project requirements.

But an AIM is broader.

The AIM brings together the information required to support the management and operation of the asset. Depending on requirements, this may include models, asset registers, documents, maintenance information, spatial data, linked systems β€” and COBie data where required.

AIR β†’ VERIFIED ASSET DATA β†’ COBie / OTHER EXCHANGES β†’ AIM β†’ OPERATIONS

πŸ“˜ ISO 19650 CONTEXT

ISO 19650-3:2020 addresses information management during the operational phase, while ISO 19650-4:2022 defines processes and criteria for controlled information exchange contributing to the quality of the PIM and AIM.

πŸ’‘ KEY MESSAGE

COBie is a structured information exchange.
AIM is the wider asset information environment.

DON’T DELIVER A SPREADSHEET AND CALL IT AN AIM.

πŸ’¬ On your projects, is COBie treated as one part of digital handover β€” or as the complete AIM?

πŸ—οΈ 019 | BIM & DIGITAL DELIVERY INSIGHTS  WHAT INFORMATION DOES AN ASSET ACTUALLY NEED?An asset does not need every para...
15/09/2026

πŸ—οΈ 019 | BIM & DIGITAL DELIVERY INSIGHTS

WHAT INFORMATION DOES AN ASSET ACTUALLY NEED?

An asset does not need every parameter we can put into a BIM model.

It needs the right information for operation, maintenance and decision-making.

That requirement should begin with the AIR β€” Asset Information Requirements.

Take an AHU as a simple example. Useful asset information may include:

βœ… Asset ID & classification
βœ… Location / system served
βœ… Manufacturer, model & serial number
βœ… Capacity and key technical data
βœ… Installation & commissioning information
βœ… Warranty dates
βœ… Planned maintenance requirements
βœ… O&M manuals and related documents

But collecting data is only part of the process.

AIR β†’ ASSET DATA β†’ VALIDATE β†’ AIM

Before information becomes trusted operational information, it should be checked for:

Completeness β€’ Accuracy β€’ Consistency β€’ Required format β€’ Intended purpose

πŸ“˜ ISO CONTEXT

ISO 19650-3:2020 addresses information management during the operational phase of assets and remains the current published standard.

ISO 7817-1:2024 provides the methodology for defining the appropriate Level of Information Need, helping avoid both too little and unnecessary information.

πŸ’‘ KEY MESSAGE

Don’t collect more asset data.
Collect the information the operator actually needs.

AIR β†’ RIGHT DATA β†’ VALIDATION β†’ USEFUL AIM

πŸ’¬ Are your asset-data requirements defined by operational needβ€”or by whatever parameters happen to exist in the model?

πŸ—οΈ BIM & DIGITAL DELIVERY INSIGHTS | 018A 3D MODEL IS NOT AN ASSET INFORMATION MODELA visually accurate 3D model does no...
14/09/2026

πŸ—οΈ BIM & DIGITAL DELIVERY INSIGHTS | 018

A 3D MODEL IS NOT AN ASSET INFORMATION MODEL

A visually accurate 3D model does not automatically become useful information for operating an asset.

A 3D model may show:

βœ… Geometry
βœ… Location
βœ… Dimensions
βœ… Spatial relationships

But an Asset Information Model (AIM) supports asset management and may also need:

βœ… Asset ID & classification
βœ… Manufacturer / model details
βœ… Serial numbers
βœ… Warranty information
βœ… Maintenance requirements
βœ… Commissioning records
βœ… O&M documents
βœ… Replacement / lifecycle information

So the difference is important:

3D MODEL = WHAT THE ASSET LOOKS LIKE
AIM = INFORMATION NEEDED TO MANAGE THE ASSET

ISO 19650 defines an AIM as an information model relating to the management of an asset. The developing ISO/DIS 19650-1 Edition 2 also emphasizes that information management is much broader than simply producing 3D models.

ISO 19650-3:2020 remains the published standard covering information management during the operational phase of assets.

πŸ’‘ KEY MESSAGE

Geometry tells us what exists.
Asset information tells us how to manage it.

3D MODEL + VERIFIED ASSET DATA β†’ USEFUL AIM

πŸ’¬ Does your handover model contain the information your FM team actually needs?

πŸ—οΈ 017 | BIM & DIGITAL DELIVERY INSIGHTS DIGITAL TWIN IS MORE THAN A 3D MODELA visually impressive 3D model is not autom...
13/09/2026

πŸ—οΈ 017 | BIM & DIGITAL DELIVERY INSIGHTS

DIGITAL TWIN IS MORE THAN A 3D MODEL

A visually impressive 3D model is not automatically a Digital Twin.

A BIM/AIM can provide structured information about an asset. A Digital Twin extends this by connecting the digital representation with real-world and operational information over time.

Depending on the asset and use case, this may bring together:

βœ… BIM / AIM β€” geometry and asset information
βœ… GIS β€” location and wider spatial context
βœ… IoT / BMS / SCADA β€” operational and sensor information
βœ… Maintenance systems β€” inspections, faults and work orders
βœ… Analytics β€” trends, performance and decision support

The value is not simply seeing the asset digitally.

It is being able to use trusted information to support operations, maintenance, performance monitoring and better decisions.

BIM / AIM + GIS + OPERATIONAL DATA + ANALYTICS β†’ DIGITAL TWIN

πŸ“˜ ISO 19650 CONTEXT

ISO 19650 does not define a Digital Twin platform. However, ISO 19650-3:2020 provides information-management requirements for the operational phase of assetsβ€”an important foundation for maintaining reliable asset information. The standard remains current while revised Edition 2 documents are under development.

Digital twins are generally understood as dynamic digital representations that connect physical assets with digital information and operational data rather than remaining static design models.

πŸ’‘ KEY MESSAGE

A 3D model shows the asset.
A Digital Twin helps us understand and manage the asset.

πŸ’¬ Is your Digital Twin strategy starting with technologyβ€”or with the operational decisions the asset owner actually needs to make?

Address

39-2-60/3, Labbipet
Vijayawada
520010

Opening Hours

Monday 9am - 7pm
Tuesday 9am - 7pm
Wednesday 9am - 7pm
Thursday 9am - 7pm
Friday 9am - 7pm
Saturday 9am - 1pm

Telephone

+918662473883

Alerts

Be the first to know and let us send you an email when VDC Engineers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share