11/05/2023
518 km *Bengaluru - Vijayawada Expressway* project (NH-544G) is a proposed 4-6 lane partially access-controlled highway with a route alignment in Karnataka and Andhra Pradesh.
Total Estimated Cost: *Rs. 19,320 crore*
Project's Approx. Length: *624 km*
Greenfield Section: 332 km (Kodikonda - Addanki)
Lanes: 46
Right of Way: 100m
Design Speed: 120 kmph
Owner: National Highway Authority of India (NHAI)
*_Package & Chainage Contractor_*
*Package 1:* Kodur (Ch. 0.000) to Vanavolu (Ch. 24.300) *Dilip Buildcon* (L1)
*Package 2:* Vanavolu (Ch. 24.300) to Vankarakunta (Ch. 45.700) *Raj Path Infracon* (L1)
*Package 3:* Vankarakunta (Ch. 45.700) to Odulapalle (Ch. 72.000) *Raj Path Infracon* (L1)
*Package 4:* Odulapalle (Ch. 72.000) to Nallacheruvu palli (Ch. 96.300) *Dilip Buildcon*
(L1)
*Package 5:* Nallacheruvu palli (Ch. 96.300) to Yerragudipadu (Ch. 129.000) *MEIL* (L1)
*Package 6:* Yerragudipadu (Ch. 129.000) to Audireddipalle (Ch. 160.000) *MEIL* (L1)
*Package 7:* Audireddipalle (Ch160.000) to Mallapalle (Ch. 176.000) *Dilip Buildcon* (L1)
*Package 8:* Mallapalle (Ch176.000) to Kavulakuntla (Ch196.000) *MEIL* (L1)
*Package 9:* Kavulakuntla (Ch196.000) to Narayanmpet (Ch203.500) *MAX Infra* (L1)
*Package 10:* Narayanmpet (Ch203.500) to
Chandrasekharpuram (Ch228.000) *MEIL* (L1)
*Package 11:* Chandrasekharapuram (Ch.228.000) to Polavaram (Ch. 260.000) *MEIL* (L1)
*Package 12:* Polavaram (Ch. 260.000) to Marripudi (Ch.285.500) *MEIL* (L1)
*Package 13:* Marripudi (Ch. 285.500) to Somavarappadu (Ch.314.600) *KNR Constructions* (L1)
*Package 14:* Somavarappadu (Ch.314.600) to Muppavaram (Ch.343.240) *MEIL* (L1)