24/04/2018
Haul road in open mine has short durability. It is because haul road is constructed without asphalt/concrete pavement and passed by big vehicle with heavy load. This research focused on grader route and schedule optimization in coal haul road maintenance. Optimization model in this research is designed using Bandit Algorithm. The objective of the optimization model is to minimize the maximum penalty.
SEMS : Systems Engineering Modelling and Simulation