Hybrid deployment for a wastewater treatment plant β‘
Battery storage, a Generator and a bunded fuel tank working together to keep the power and the site pumps flowing!
β
1x Atlas Copco ZBP 45/75 Battery Storage Unit
β
1x Atlas Copco QAS 60kVA Generator
β
1x Western Global 2,000L Fuel tank
β
1x 125A MDU
With the battery powering most of the operations and the generator only kicking in to run the site while the battery recharges, there will be:
β
Reduced noise
β
Reduced Emissions
β
Reduced refuel trips with an expanded fuel capacity
β
Consistent, uninterrupted power