06/10/2026
Year 6 took part in a DT workshop today to introduce them to the world of construction. This workshop was linked to the A249 Bearsted Road improvement works in Maidstone.
The workshop provided Year 6 with an introduction to construction and infrastructure, some of the careers available within the industry, and a practical design-based activity linked to a real local project. As the Bearsted Road Improvement Scheme is focused on road and junction improvements, the children took part in a fun, interactive design challenge linked to highways and infrastructure.
We most definitely have some future construction minded children amongst Year 6!