08/10/2026
🏭 When an industrial repair can’t wait, neither can the access solution.
A severely corroded 30" pipe at the top of a vessel required urgent repair- but before the repair could begin, safe access was needed around the full circumference of the pipe, above the repair area and into the vessel's existing steelwork.
Zenith responded quickly.
Our in-house engineers developed a bespoke scaffold solution, which was then designed, supplied and erected by our specialist site team within days.
🔹 Engineered around existing vessel steelwork
🔹 Full circumferential access to the pipe
🔹 Walkway access from the vessel dome and existing gantry
🔹 Habitat and workstation access for the repair team
🔹 Rapid design-to-installation response
The result: a safe, practical access solution delivered at speed- allowing essential repair works to get underway without unnecessary delay.
This is where Zenith's in-house engineering and specialist access capabilities make the difference.
📩 Need a rapid, engineered access solution for an industrial repair?
Speak to the Zenith team today to discuss your requirements:
🔗 https://lnkd.in/ek-YtHpE