10/08/2026
A project update from Far Houses 🌿
Progress continues at the Far Houses project as we move further into the next phase of conservation.
From above, it's easier to appreciate the scale of the historic farmstead and the extent of the work taking place across the site. With the most vulnerable sections now stabilised, attention is turning to protecting the exposed wall tops. Across the project, both hard capping and a hybrid soft capping technique are being used, with each approach carefully selected to suit the condition and requirements of different areas of the site.
Each technique has an important role to play. In some areas, a hybrid soft capping technique is being used, where sections of hard capping are formed on either side of the wall top, creating a central trench. This trench is then infilled with soil before turf, harvested gradually from the surrounding fields, is carefully laid over the top and secured with bamboo pegs while it becomes established. In other areas, hard capping is being used where a more robust level of protection is required. Together, these carefully considered conservation techniques help regulate moisture, reduce long-term erosion, and protect the remaining masonry, helping to preserve the farmstead for future generations.
Projects like this are built on patience and understanding. Every stage is carefully planned, ensuring each intervention respects the building's history while contributing to its long-term conservation.
➕More updates from Far Houses to follow as the project progresses — follow us for updates from site.
🔗If you have a heritage, conservation, or natural building project you would like to discuss, please get in touch via our website (link in bio).
❓What do you find most fascinating about the conservation of historic places like Far Houses?