Overall budget: € 6 846 750
EU contribution: € 5 602 934,26

https://cordis.europa.eu/project/id/870114

Project information
NRG-STORAGE

Grant agreement ID: 870114

Start date: 1 April 2020
End date: 31 March 2024

Funded under: H2020-EU.2.1.5.2.

25/05/2023

We joyfully announce: The installation work of the NRG-Foam insulation panels on the demo buildings in Sofia was successfully completed. 🥳

Next Steps: At the upcoming project meeting with the European Commission, we report on the status quo of our Horizon 2020 funded research programme. We will keep you updated on this! 🤗

nrg_storage 14/04/2023

The construction of the demo houses reached its final stage. 🙌🏻 The last batch of NRG-Foam panels is arriving at the demo site in Sofia, Bulgaria. 🏘️ We are very excited that the demo houses will soon be ready and we will keep you updated about this.

nrg_storage

nrg_storage 11/04/2023

The ageing chamber is ready to test the NRG-Foam panels. 🏁

What does the ageing chamber do? The chamber provides different conditions of heat and frost to emulate the environment to which the panels will be exposed and try to predict their long term utility lifespan. The applied programme is operated in such a way that each climatic cycle consists of, for example, 45 minutes of solar and UV radiation with heating to a temperature of +50 °C 🥵, and 45 minutes of freezing to -20 °C 🥶. The time of each cycle may also be extended or shortened.

Such quick changes in temperature simulate the accelerated ageing of the samples: 100 simulated cycles correspond to about 2️⃣ years of natural weathering (based on literature). The tests are made to check the behaviour of the phase change material embedded in the ultra-light foam-cement composite under heating-cooling cycles.

👉🏻 to get some impressions of the ageing tests.

nrg_storage

11/04/2023

Get some impressions of our visit to Sofia, Bulgaria, when our project team trained the employees of the project partner GBS in Sofia on how to correctly applicate the NRG-Foam insulation panels. 🎥

Photos 08/03/2023

On February 1, the installation of the first batch of NRG-Foam insulation panels on the demo buildings in Sofia took place - a special milestone in our project. ✨

More NRG-Foam insulation panels are continuously delivered to complete the facade works on the demo houses. 🏗️

nrg_storage 06/03/2023

On a business trip ✈️ in Sofia, Bulgaria: On January 31 📆📌, the CEO of Röser Ingenieurbeton (RIB) and the project coordinators of TU Damstadt trained the employees of the project partner GBS in Sofia on how to correctly applicate the NRG-Foam insulation boards. 👉🏻 to get some impressions of our application training.

Despite temperatures close to freezing 🥶, we had a lot of fun showing our Bulgarian partner the application of the NRG-Walls. 🤗

nrg_storage

Practice makes perfect ✨ 03/03/2023

Before the new NRG Foam insulation panels are installed in Bulgaria 🇧🇬, project partners Netzsch, Röser Ingenieurbeton (RIB) and TU Darmstadt tested the correct application of the insulation panels on RIB's company site.

Once again you realize how fast time flies when you work with your hands. 😅

Practice makes perfect ✨

Photos 01/03/2023

To enable the testing of a new NRG-Wall sample in the hotbox, employees of the project partner NETZSCH are installing the necessary temperature and heat flux sensors. ⚙️🔧

Photos 27/02/2023

While the production of the NRG-Foam insulation panels is running at full speed 🔥, the NRG-Walls are tested in the hotbox at CAE in Würzburg.

With lots of necessary man- 👷🏼💪🏼 and womanpower 👷🏻‍♀️💪🏻, another NRG-Wall sample is changed for a new hotbox measurement.

Photos 24/02/2023

Stacked on top of each other the first batch of NRG-Foam insulation panels is ready to be shipped to Bulgaria 🇧🇬 for installation. 🚢📦

There will certainly be quite a bit of bubble wrap needed. 😉

09/12/2022

Spellbound silence at the NRG-STORAGE Workshop in Prague. 🤫

Expert speakers 🤓💬 presented all project-specific results 💥 as well as innovative approaches to the smart use of heat storage technology in combination with sustainable insulation technology in the building industry. 🏗️

Wollen Sie Ihr Schule/Universität zum Top-Schule/Universität in Darmstadt machen?

Klicken Sie hier, um Ihren Gesponserten Eintrag zu erhalten.

Lage

Telefon

Adresse


WiB Institute
Darmstadt
64287