09/14/2020
Another remarkable project completed by our Glass8 production team.
Exterior curtain wall, interior aluminum partitions and spectacular 4-level staircase glass railings
Glass, Glazing & Facade, Services
09/14/2020
Another remarkable project completed by our Glass8 production team.
Exterior curtain wall, interior aluminum partitions and spectacular 4-level staircase glass railings
10/13/2017
We're so proud to have been part of the construction team at the new Ecole Sage Creek School in Winnipeg. Along with Bockstael Construction Limited, the team created a beautiful, bright, and vibrant facility for the community.
Look closely, and you'll not only notice the emphasis on the use of natural light within the school, but it's also 'bird-friendly'! Glass 8 Inc. provided a specific pattern within the glass itself to help our little friends see the glass, reducing bird strikes!
10/06/2017
Stopped by the new Windsor Park Library in Winnipeg today to see our crew putting the finishing touches on a great project!
This will be a fantastic space! So much exterior light! Great use of as much glass as possible!
http://wpl.winnipeg.ca/library/whatshappening/renorenewal/pewnsp.asp
06/19/2017
Glass installation is underway! Proud to be part of this project at CFB Edmonton; building a new health services facility for our Canadian Armed Forces!
11/23/2016
Mobilization a stones throw away at CFB Edmonton Health Services Centre for Aman Builders. Updates to follow.
08/22/2016
http://www.glasscanadamag.com/under-the-glass/under-the-glass-return-of-the-entrepreneur-4303
Return of the entrepreneur There was a chocolate cake on a side table at the Glass 8 office at the eastern edge of Winnipeg. It said ‘Congratulations, Glass 8’ in blue icing. It...
.pdf copies of July's News At Eight, and copies of all previous editions, are now available on Google Drive by clicking here: https://drive.google.com/folderview?id=0B3v3eLH-2X1ec3RTQUMxRWVBTGM&usp=sharing
Happy reading and happy glazing!
07/11/2016
In the News at Eight this month:
- New projects, new clients
- Fail to Plan, Plan to Fail – The importance of the project schedule - A Touch of Glass…
- Spontaneous Breakage – The break-up that you weren’t expecting
Better late than never, the June edition of Glass 8 Inc.'s News At Eight is ready! See it here: https://www.slideshare.net/slideshow/embed_code/key/D9xxA0zuOnXgaA
This month:
- Bridgwater Commercial development
- Switchable Smart Glass
- G8 Transition… It’s been 3 months!
- You say: ‘It Can’t Be Done.” I hear: Opportunity!
Lots going on in May....catch our newsletter for the very latest News at Eight!
https://www.slideshare.net/slideshow/embed_code/key/h1QenggD3M4lKs
04/03/2016
Mobilizing at The University of Manitoba, Tache Hall expansion. Thank you to Bird Construction for accommodating our 'big push' mentality!
03/14/2016
Very kind of U.S. Glass magazine to run a brief article detailing our inception and growth.
New Canadian Curtainwall Manufacturer On The Move | USGlass Magazine & USGNN Headline News Glass 8 recently secured a 14,000-square-foot facility, where it will manufacture and distribute curtainwall and other glazing products. There’s a new