North Bala Hydro Small Project

North Bala Hydro Small Project Small hydroelectric generating facilities in Ontario This website is to provide project updates to the redevelopment of the North Bala Falls Waterpower Project.

The original facility was demolished in the 1970s. Swift River Energy is currently pursuring the redevelopment of this site with a new modern waterpower facility to provide clean, green, renewable energy into the Ontario power grid. The environmental screening report completed in 2009, its addendum issued in 2012 and other studies completed on the project including an economic impact study are provided on the project's website at www.balafalls.ca.

Survey Results are in! Learn more about the Design and Consultation Plan and See Survey Resultshttp://www.balafalls.ca/d...
09/08/2014

Survey Results are in! Learn more about the Design and Consultation Plan and See Survey Results

http://www.balafalls.ca/design.html

Project website for North Bala Small Hydro Project

Our August Project Update is now out and contains an extensive Q&A section along with benefits and waterpower facts.See ...
09/08/2014

Our August Project Update is now out and contains an extensive Q&A section along with benefits and waterpower facts.

See below or go to www.balafalls.ca

Our July Project Update Flyer is now out. See it here or on our website at www.balafalls.ca
09/08/2014

Our July Project Update Flyer is now out. See it here or on our website at www.balafalls.ca

Our June project newsletter is now out. See it here or on our website at www.balafalls.ca
09/08/2014

Our June project newsletter is now out. See it here or on our website at www.balafalls.ca

In case you haven't seen it, here is our June project newsletter, highlighting traffic, heritage & local economy. pic.tw...
09/08/2014

In case you haven't seen it, here is our June project newsletter, highlighting traffic, heritage & local economy. pic.twitter.com/U20A7tgUKE

Bala Project to produce approx 20 million kWh. See what you can do with just 1 kilowatt-hour (kWh) http://t.co/AU9BXNkm0...
09/08/2014

Bala Project to produce approx 20 million kWh. See what you can do with just 1 kilowatt-hour (kWh) http://t.co/AU9BXNkm0Y

It is an interesting comparison. I think most folks would take one cake over 90 cups of coffee on most days :)

Please visit the Project website at http://www.balafalls.ca/  for all results of the Stage 1 Design Concept Survey. pic....
09/08/2014

Please visit the Project website at http://www.balafalls.ca/ for all results of the Stage 1 Design Concept Survey. pic.twitter.com/1XdGCdqEl3

May 2014 Newsletter - "79% of respondents prefer the use of Township Lands rather than Margaret Burgess Park during cons...
09/08/2014

May 2014 Newsletter - "79% of respondents prefer the use of Township Lands rather than Margaret Burgess Park during construction" - 2014 Concept Design Survey

09/08/2014

Q: How will the project affect the local economy?
A: Swift River Energy anticipates an overall positive impact to the area from economic stimulation in relation to a $23 million construction project. In the long term, it is also felt that the newly refurbished park with scenic lookouts will be a tourist attraction and help to keep visitors in the area longer.

09/08/2014

Q: What about flows over the South Dam rapids?
A: These flows will very all year, but will not drop below 2 m3/s in the summer or below 1 m3/s the rest of the year. The average flows over this dam, will, however, be significantly higher than these minimums. Swift River Energy recently organized a multi-stakeholder committee to review the flows over both the dams. We hope to have some community recommendations from this committee by the end of October.

09/08/2014

Q: What about the rest of the year?
A: It is proposed to maintain the historical summer flows at the Bala Falls all year, with the exception of during the spring walleye spawning period, when significantly higher flows will be released over the Bala Falls.

09/08/2014

We have set up this site to answer the questions from the public. To start the ball rolling I will put out some of the one's that I have heard recently:

Q: Will the falls dry up to a trickle?
A: No. SREL is committed to maintaining the historical summer flows over the Bala Falls (at the North Bala Dam).

Address

3111 Muskoka Road 169
Bala, ON
P0C1A0

Alerts

Be the first to know and let us send you an email when North Bala Hydro Small Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The School

Send a message to North Bala Hydro Small Project:

Shortcuts

Share