04/06/2015
FINAL ASSIGNMENT
Our final presentation was in the days 1st and 3rd June!
Until next week, we will publish here the final results of our class.
In this stage of the project, we must have complied with all the occupation, circulation and permeable area requirements, showing in a table with all square footage of each project. Also, we must have a good spatial organization, pre-sized and well thought structural system, and most refined design of buildings and open spaces: equivalent to a preliminary study. Remembering that we had, during this project, the task of combining the diverse uses using an favorable structural grid for all of them.
Check out the results!
http://arch4thyear.wix.com/senac #!blog/c20ci
***
ENTREGA FINAL
Nossa apresentação final foi nos dias 1º e 3 de Junho!
Até a próxima semana, vamos publicar aqui os resultados finais da turma.
Nessa etapa do projeto, nós temos que cumprir com todos os requerimentos de ocupação, circulação e área permeável, mostrando-os em uma tabela com toda a metragem quadrada de cada projeto. Também temos que ter uma boa organização espacial, sistema estrutural pré-dimensionado e bem pensado, e um desenho mais refinado dos edifícios e dos espaços livres: o equivalente ao estudo preliminar. Lembrando que nós tivemos, ao longo deste projeto, a tarefa de combinar diversos usos utilizando um grid estrutural favorável a isso.
Veja os resultados!
http://arch4thyear.wix.com/senac #!blog/c20ci
Our final presentation was in the days 1st and 3rd June! Until next week, we will publish here the final results of our class.