18/08/2026
Congratulations to the team on successfully completing the installation of the second concrete rain water tank at our Jordan Springs Project.
The tank has been installed, the area backfilled, and the ground compacted with precision—all completed safely and without incident.
A great result and another important project milestone. Very proud of the team and the quality of work delivered. 👏
Taylor | Australia
13/08/2026
Great work by the team on the Paddington Project, successfully installing a Stormwater Gross Pollutant Trap (GPT) while working within the water table.
This was a challenging installation involving continuous dewatering, sanitising the extracted water before pumping it back into the stormwater system, and installing the GPT with a high level of accuracy to connect into the Sydney Water asset. The works also involved core drilling an 800 mm pe*******on through the existing canal wall to complete the connection.
A great result by everyone involved.
21/05/2026
Our team has successfully installed the first of two large rainwater tanks.
This installation marks another step towards delivering more environmentally responsible projects.
15/04/2026
Moeco Plumbing has taken delivery of the first of three new 13T Komatsu PC13-8 excavators, purchased to support and deliver our civil works across multiple projects.
Our operators, especially Andrew, are excited to get behind the controls of the latest machines, equipped with all the modern features and technology.
The first project underway.