A snapshot of Design and Construct project work from 2021 incorporating the Roachdale Reserve Pavilion and Martins Well Rangeland Reserve amenities. Images by Nicolas Bohorquez, Araceli Silva Moyano, Amy Tran and numerous other contributing students enrolled in 2021 UniSA Design and Construct electives. .architecture
12/12/2021
Congratulations to (left) for receiving the UniSA Nicholas Opie Award in Design and Construction 2021, presented by Joti Weijers-Coghlan.
This award recognises the significant contribution Bradley made to Design Construct in 2021, which involved developing components of the prototype ablutions block for - Well done!
architecture
06/08/2021
Design Construct is out on site, measuring up for a new project amongst the trees a short drive from .
We’re looking forward to this exciting new collaboration with the .
Time to hit the team!
18/11/2020
Following the installation of the roof, the 6mm clear acrylic louvres were installed: lightweight, easy to transport and cut with a regular timber saw.
.architecture
16/11/2020
With the shower roof on, it’s time for the fit-out.
.architecture
11/11/2020
Laying down the rolled corrugated sheets of the butterfly roof over the showers. The plywood box in the gutter was a temporary measure to hold the roof sheets in position while fixing into place.
.architecture
05/11/2020
The corrugated internal wall lining and exposed galvanised plumbing maintain an agricultural aesthetic for this rural shower. Remote and robust.
.architecture
03/11/2020
It was a quick scramble with the plumber on site to get the gas connections, boiler and shower supply plumbing done in a day.
.architecture
02/11/2020
Next steps: install prefab end walls and box gutter (500mm wide so you can get a broom in there!)
.architecture
30/10/2020
Back on site it was a race to get the slatted shower floor in before the rest of the walls went up.