Since 1989 Kiley Roofing has been helping Business's , Manufacturing facilities, Warehouses, Schools, Churches and Homeowners, with their roofing concern's

Photos from Kiley Roofing Flat Roof Experts's post 03/22/2020

VERSICO Mechanically fastened thermoplastic TPO - Retrofit over modified bitumen . New retrofit drains with clamping ring assemblies. TIE IN TO THE EXISTING is water blocked Screws and plates , Roofing cement with fiberglass mesh Modified cap sheet over tie in is torched to the existing warmed up -stick and rolled with a heavy roller to the TPO.

Photos from Kiley Roofing Flat Roof Experts's post 03/21/2020

Installing Thermoplastic mechanically fastened TPO. Emergency - Leaking

Photos from Kiley Roofing Flat Roof Experts's post 03/21/2020

Condo building going up This will have spiral staircases going from the upper 4 unit porches to the rooftop deck
Thermoplastic TPO roof system

03/17/2020

Quality Control Services
Mr Dave Nolan : President Mechanically fastened thermoplastic TPO roof
system : Completion picture

Photos from Kiley Roofing Flat Roof Experts's post 03/07/2020

Mechanically fastened TPO -
Retro fit over existing EPDM
** For His Royal Highness
Mr. Dave Nolan

Photos from Kiley Roofing Flat Roof Experts's post 03/07/2020

Barrio completion pictures
Beauty 😊🍀

Photos from Kiley Roofing Flat Roof Experts's post 02/01/2020

Repair incorrectly installed TPO roof which is trapping water that gets behind the vinyl siding leaking there and at the drain which was not correct- no clamping ring just caulk
Remove Siding Heat weld 24 inch apron sheets of TPO up walls . Install ice and water shield around windows and over the top of TPO and directly to the bare wood substrate walls Install 30 pnd felt over ice and water shield . -----------
Tomorrow install siding. Remove parapet caps Flash outside masonry wall with TPO up and over to outside edge of wall reinstall parapet caps Install new 2" Retrofit drain with clamping ring assembly Rework and flash through the wall scupper drain that had been eliminated by others 😊

12/22/2019

MERRY CHRISTMAS

Photos from Kiley Roofing Flat Roof Experts's post 12/13/2019

Quality Control Service - QCS
Mr. Dave Nolan President
Gravel removal install 1/2 inch recovery board GAF Everguard -0.60 thermoplastic TPO roof system mechanically fastened

Photos from Kiley Roofing Flat Roof Experts's post 10/10/2019

Ponding water issues .
Removing the layers of roofing down to the deck. Installing Four inch drains with sub pans at deck level .
Installing insulation in the lower section to pitch the water to the drain
Making drainage trenches in other ponding areas .

Photos from Kiley Roofing Flat Roof Experts's post 08/13/2019

Roof load Themoplastic- TPO
roof system 🍀

Want your school to be the top-listed School/college in Cleveland?

Click here to claim your Sponsored Listing.

Location

Telephone

Website

Address

3111 Carnegie Ave
Cleveland, OH
44115-2632