Project: Dulwich College Phase 2
Architects: DP Architects
Project Manager: CPG Consultants Pte Ltd
Main Contractor: Koon Seng Construction Pte Ltd
Scope of Work: Design, Supply and Installation of an exact replica of the Classical Facade of the 400 year old Dulwich College London for the Singapore Dulwic College Phase 2.
Contract Period: Current
22/12/2015
Location: Singapore
Award: President Award Recipient 2008
Architects: WOHA Architects Pte Ltd
Main Contractor: Tiong Aik Construction Pte. Ltd.
Scope of Work:
Design, Supply and Install of various cladding component in Architectural Precast Concrete and GRC with off-mould Finishes, in Black/ Charcoal Grey color with some panels made with 3 different finishes on the same panel.
Completion: December 2009
22/12/2015
Location: Singapore
Scope of Work: Off-mould Precast Concrete
22/12/2015
Project: Nanyang Technological University (NTU), The Learning Hub
Consultants: Heatherwick Studio (UK) / CPG Consultants Pte Ltd
Main Contractor: Newcon Builders Pte Ltd
Scope of Work: Design, Supply and Install Precast Concrete and GFRC Claddings with Integral Colours and Textures. No pigments used in the colouring of the precast. Colour and textures developed especially for this project by LWC, in collaboration with the Architects.