12/12/2025
The CAST-SOX team, led by Dr. Ryan G. Banal together with Engr. Edmar S. Andang and Engr. Arniel Vhien A. Lisondra, recently assisted ATR Construction during their site visit for the upcoming CAST-SOX Building. Present from ATR Construction were Ray Gerson S. Repalbor, Site Engineer; Virginia S. Repalbor, Project Coordinator; and Efren A. Torrecampo, Foreman. The team carried out initial site assessments and layout planning to ensure that all structural, functional, and logistical considerations align with the project’s requirements. The construction is expected to be completed within 60 days, marking an efficient and timely rollout for the CAST-SOX facility. This collaborative effort stands as another significant step toward establishing a dedicated center that will advance innovation and technocasting in the SOCCSKSARGEN region.