AI in Construction

AI in Construction Practical AI tools for QS, Engineers, PMs, and Construction Owners worldwide. Real workflows. No coding. Built by a practitioner.

03/08/2026

Let's make a BOQ using Claude;
Use the Prompt below and fill out the placeholders based on your project:

"You are an experienced Quantity Surveyor. Based on the following project description, generate a preliminary Bill of Quantities, line by line, following [measurement standard, e.g., POMI/SMM7/CESMM4] measurement rules. Project type: [project type] Scope description: [paste drawing/spec description or scope narrative] Exclusions: [list exclusions] Unit system / currency: [units, currency] Drawing reference and revision: [drawing no. / rev / date] For each BOQ item, output: Item description | Unit | Approximate quantity | Basis of quantity (assumption used) | Rate (leave blank placeholder for pricing). Where the description is insufficient to measure an item accurately, do not guess a quantity β€” instead flag the item and state exactly what additional information (dimension, drawing, spec clause) is needed to measure it properly. Maintain the formulas to develop or add items in future."

Honest question for site-side and office-side folks.How do you currently track open RFIs on your projects?πŸ”² Dedicated Ex...
24/07/2026

Honest question for site-side and office-side folks.
How do you currently track open RFIs on your projects?
πŸ”² Dedicated Excel/Sheets log
πŸ”² Project management software (Procore, Asana, etc.)
πŸ”² Email thread + memory
πŸ”² Paper log / site diary
No wrong answer. I'm asking because I suspect the delay isn't the writing β€” it's the tracking. Curious if that holds across different setups.

I went back and counted. Fourteen open RFIs on one project, and three of them I genuinely couldn't tell you the status o...
22/07/2026

I went back and counted. Fourteen open RFIs on one project, and three of them I genuinely couldn't tell you the status of without digging through email threads.
Not because no one answered. Because there was no single place tracking what was raised, what was still open, and what was quietly overdue.
This week I rebuilt the RFI log properly, so overdue items are impossible to miss instead of something you find out about in a coordination meeting. The letter template sits next to it, so raising a new one doesn't start from a blank page either.
None of this needed AI to fix. It needed five minutes of admin I kept deprioritizing.

What's your actual system for tracking open RFIs β€” a log, a PM tool, or honestly, your inbox?

19/07/2026

Struggling with creating RFI format and log, here is the prompt to create all just in 4 minutes.

Comment "Prompt" and I will share the prompt if you need!

Same project, same cost data. One version took four hours to build. The other took twelve minutes to structure β€” then I ...
16/07/2026

Same project, same cost data. One version took four hours to build. The other took twelve minutes to structure β€” then I spent the time that mattered on checking it.
This isn't about AI replacing quantity surveying judgement β€” it's about not spending your evening on formatting a spreadsheet instead of reviewing the numbers.
Tag a QS or cost controller who'd want their evenings back.

No judgement. Just curious.Which cost task genuinely eats the most of your week?πŸ”² BOQ takeoff and pricing πŸ”² Budget varia...
14/07/2026

No judgement. Just curious.
Which cost task genuinely eats the most of your week?
πŸ”² BOQ takeoff and pricing
πŸ”² Budget variance reporting
πŸ”² S-curve / cost forecast updates
πŸ”² Reconciling site measurements against the BOQ
No wrong answer β€” this looks different for a QS, a PM, and a cost controller.
Drop yours below.

For the past several months I have been doing something on top of my day job on site. It is nearly ready. ⏰I have been b...
09/07/2026

For the past several months I have been doing something on top of my day job on site. It is nearly ready. ⏰

I have been building a prompt library specifically for construction professionals β€” PMs, QSs, contract managers, and document controllers. Not a generic AI guide. Not a "10 ways AI will change construction" article. A practical, ready-to-use resource built from real project experience on FIDIC and NEC contracts across GCC and Southeast Asia.

Everything in it has been tested on actual projects. Not case studies. Not simulations.

I am not ready to share details yet. But I wanted to give you a first look at what I have been working on.

The thumbnail on this post is a blurred preview of one page from the library. If you want to be the first to know when it is available β€” follow this page.

No launch date set yet. I will post here when it is ready.

If you tracked your hours honestly this week, what percentage went to writing, formatting, and chasing documents? πŸ’‘Not r...
07/07/2026

If you tracked your hours honestly this week, what percentage went to writing, formatting, and chasing documents? πŸ’‘

Not reviewing drawings. Not solving technical problems. Not managing people or programme. Just documentation!

I have asked this question to construction PMs, QSs, and contract managers across GCC and Southeast Asia over the past few years. The typical honest answer ranges from 40% to 60% of the working week.

That is not a productivity observation. That is a structural problem with how the industry runs.

Quick poll below β€” pick the bracket that is closest to your honest answer this week:

β˜‘ Less than 25% β€” documentation is not my main time sink
β˜‘ 25% to 40% β€” significant but manageable
β˜‘ 40% to 60% β€” this is the majority of my working week
β˜‘ More than 60% β€” I feel like a document factory, not a project manager

Drop your role and market in the comments too β€” I want to see if this looks different by region or by contract type.

πŸ“£Most RFIs take 45 minutes. This one took 4. Here is exactly how!The blank page is the problem. Not the RFI itself. πŸ“ Yo...
06/07/2026

πŸ“£Most RFIs take 45 minutes. This one took 4. Here is exactly how!

The blank page is the problem. Not the RFI itself. πŸ“

You know what an RFI needs to say. You have raised dozens. But every time you start a new one, you spend the first 20 minutes getting the structure right, finding the right formal tone, and making sure the programme and cost impact sections are professionally worded.

Here is the prompt I use to get a complete RFI first draft in under 5 minutes. Copy it, replace the placeholders with your own project details, and paste it into Claude or ChatGPT.

The output will not be 100% final β€” you will always need to review and adjust for your specific project. But you will be working from a complete, professionally structured draft instead of a blank page.

Try it this week and drop a comment below β€” tell me how long it took and what you changed.

It was a FIDIC Cl.20.1 notice. I knew exactly what to write. But getting the words in the right order took most of my ev...
02/07/2026

It was a FIDIC Cl.20.1 notice. I knew exactly what to write. But getting the words in the right order took most of my evening.

I spent 3 hours on a delay notice one evening. Then I tried something different.
It was a Cl.20.1 notice under FIDIC Red Book. I knew exactly what it needed to say. The event was clear, the timeline was documented, the contractual basis was solid.
But drafting it β€” getting the precise language, the right level of formal tone, the correct sequencing of facts β€” took most of my evening.
The next similar notice I needed to write, I tried using an AI tool as a first-draft assistant.
I gave it the event description, the clause, the parties, and the key dates.
The first draft came back in under 2 minutes. It was not perfect β€” I edited about 30% of it. But the structure was right, the tone was right, and it gave me something to work with rather than a blank page.
Total time: 18 minutes instead of 3 hours.
I am not saying AI writes your documents. I am saying it removes the blank page β€” and on a project under contract pressure, that matters.
Has anyone else tried this for contract correspondence? What was your experience?