22/04/2026
As of January 1, 2026, S-100 capable ECDIS systems can be legally installed and used under IMO Resolution MSC.530(106)/Rev.1.
By January 1, 2029, every newly installed ECDIS must be S-100 compliant. That includes retrofits and replacements.
Here is what is actually changing for the captain on the bridge.
S-100 replaces the current S-57 ENC format with a new framework that supports far richer data layers:
- S-101: New electronic navigational charts
- S-102: Bathymetric surface data
- S-104: Water level information
- S-111: Surface current data
- S-124: Navigational warnings
- S-129: Under-keel clearance management
Modern S-100 systems are designed as dual-fuel, capable of displaying both S-57 and S-101 charts during the transition.
But the practical impact is this.
The screen you have looked at for years is going to look different.
The data behind it is going to be richer and more complex.
The update cycle is going to be faster.
Existing S-57 systems already in operation do not need to be replaced. But Flag State inspectors will expect you to understand whatever system is on your bridge.
(ctto)
BIPSU Maritime