Requirement:
Urgently, a Geologist is required for the HP Project site based job, full time, +2 years Experiences. Salary Negotiable.
Anyone interested send your CV on [email protected] or contact 9841477744 as soon as possible.
Vision+ Design and Services Pvt. Ltd.
Engineering Consultancy and Construction Firm architects, engineers, overseers, junior technicians, mason etc.
Vision plus design and services pvt ltd has been established as one of the full time Nepalese consulting firm with a noble aim to provide the customize technical consulting services in the field of planning, architecture, engineering, designing, landscaping, management, socio-economic, techno-economic and environmental studies and other development activities adopting international standard of pro
10/01/2020
Roof Water proofing technology
25/12/2018
Concreting work in process
Going through The first TBM inNepal, contractor China Railway and COVEC, with total length of 200m, dia 5m is starting to excavate of target length 12km in BHERI -BABAI Diversion project. We would like to share some of self captured clips during its final testing.
"तपाईं भोट् हालेर पुराना नेतालाई छान्नुस्, अनि छोराछोरीले भोट् हाल्न नयाँ देश छान्नेछन!"
09/11/2017
Measure Everything Only With Your Hands - Engineering Feed Measure tricks are always welcomed because we do not always have the measurement tools at touch. Generally, we need the measurements for different things on daily basis. Also, we can not always have the tools with us. For that purpose, we will give you tricks for measuring different systems like cen...
09/11/2017
Difference between Plastering and Pointing - Engineering Feed In this content, we are going to show the difference between plastering and pointing. Plastering is used to protect the exposed surface of masonry. However, in pointing only joints are properly filled with mortar. Cement, sand and lime are used in plastering. In pointing, we use just cement mortar.…
09/11/2017
Development length and Lap length - Engineering Feed Lap length addresses the length of the bar needed to transfer the stresses to the other bar whereas Development length addresses the length of the bar
19/05/2017
Why is Bitumen Used in Road Construction? Properties and Advantage of Bitumen for Pavements Bitumen is used in road construction due to various properties and advantages it has over other pavement construction materials. Advantages of bitumen for road construction is discussed.
Click here to claim your Sponsored Listing.
Location
Contact the school
Website
Address
Thimi