Every dollar will take us closer to Vision 22. Josephians, have you made your own block? Location: The first ever donor wall is located just right outside the newly constructed Innovation Hub on the 2/F of SJC campus on 7 Kennedy Road. Project Team: The wall is designed in a collaborative manner among a team of old boys and school management. From concept development, design, material selection, p
rototype and mockup old boys from different generations have worked very closely with the school management. Peter Yao (1979) being the lead designer, Tony Wong (1993) in the 3D design & actualization and materials selection, Mr. Kwok (1998 and school VP) being the liaison with the main contractor and architect (for the Innovation Hub) as well as the leadership from Principal Wong Y.F.. Convened by Jason Yau (1992), interview video shooting and production by Raymond Yuen (1985) and mockup samples by Kenneth Wong (1985), just to name a few. In addition, our visual art teacher, Ms Ip, and a few SJC students have also contributed to the initial design of the wall. A showcase of how different generations of Josephians have come together for a good cause!