FEA of steel elbow
Ecen
Ecen develops and operates its own Small Hydropower Plants. Provides services to third parties who wish to invest in Small Hydropower Plants.
The company has contributed to the development of a large number of Small Hydropower Plants in Greece and has gained great experience in this field. The company's activities cover the whole range of development, implementation and operation of a Small Hydropower Plant, the initial assessment of a site, the initial and final technical studies, completion of licensing procedures, arranging partnersh
08/10/2013
SHPP KAKOREMA
08/10/2013
08/10/2013
The scope of the study was to design a steel elbow for above ground installation that can bear the thrust load caused by the flow of 1,7 m3/s and a head of 260m. The elbow is 30o and will be the last part of the pentock assembly.
In order to reduce the downtime of the Hydro Plant operation, the decision was to avoid the construction of concrete thrust block for this elbow. The steel elbow was reinforced the FEA results shown that it will be capable to bear the thrust load.
Click here to claim your Sponsored Listing.
Location
Telephone
Website
Address
Thessaloníki