Preserve Bedale's Beauty : Say No To Solar Sprawl

Preserve Bedale's Beauty : Say No To Solar Sprawl Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Preserve Bedale's Beauty : Say No To Solar Sprawl, Education Website, Bedale.

We share our concerns about the proposed utility scale Industrial Solar developments which will destroy the agricultural land around our historic market town and the surrounding villages.

Knepp Castle is a shining example of what can be done on large Estates where the landowner has foresight.
06/09/2026

Knepp Castle is a shining example of what can be done on large Estates where the landowner has foresight.

In 1987, a farmer in the Sussex countryside of England began a process that would take fifteen years to become intentional and another fifteen to become famous. He stopped managing his land with the intensity that modern farming requires — stopped spraying, stopped ploughing in the same patterns, stopped fighting the natural succession that farming continuously interrupts. The land began to change. Scrub returned. Then the plants that scrub shelters. Then the insects that the plants feed. Then the birds that the insects sustain. Then larger animals following the smaller ones back into a landscape that was creating the conditions they needed without being engineered to create them. By 2022, the Knepp Estate — the farm that this process produced — had become one of the most biodiverse sites in lowland England, hosting turtle doves, purple emperor butterflies, peregrine falcons, and populations of species that had not been recorded in the region for decades.

Rewilding is not wilderness. This distinction matters. Wilderness is what exists when human activity has not significantly altered an ecosystem — a condition that applies to a shrinking fraction of the Earth's land surface. Rewilding is what happens when human activity deliberately reduces its management intensity and allows ecological processes to resume. It is not passive — it requires active decisions to stop doing things, and sometimes active decisions to reintroduce species or restore physical features like river meanders. But its character is fundamentally different from conservation management that tries to engineer a specific ecological outcome. Rewilding sets conditions and steps back. The ecosystem decides what to do with the conditions.

The farmer in the image — standing at the edge of his recovering field, uncertain whether he made the right decision — is in the position of everyone who has committed to a process whose outcome they cannot control and cannot fully predict. His neighbors think he is wasting land. His balance sheet is worse this year than last. His field has more species than it has had in forty years. These three facts coexist without resolution. The field does not know about the balance sheet. It knows about the conditions — the reduced disturbance, the returning hedgerows, the restored stream — and it is responding to them with the biological exuberance of a system that has been waiting for the pressure to ease.

The insects came back first. They always come back first — their generation times are short enough that a single season of improved conditions can produce a measurable population response. Then the birds that eat the insects. The recovery is not linear and not predictable and not photogenic in the way that conservation campaigns prefer. It is messy and provisional and slower than the loss was. But it is happening. The field is sure, even when the farmer is not.

🌿 It doesn't look like wilderness. It looks like something trying to remember what it was before we organized it into something we could extract from. The hedgerows are knee-high — young, provisional, already hosting the first returning insects. The stream meanders now where it was straightened for drainage; the gravel beds where fish spawn are coming back. The scrub at the margins is messy and essential and exactly what a recovering ecosystem looks like before it becomes what people will eventually call beautiful. The farmer stands at the edge of it, uncertain. His neighbors think he is wasting land. His balance sheet thinks the same. His field disagrees. The insects came back first. Then the birds. The field is doing what living systems do when the pressure eases — it is remembering. Slowly, messily, without asking permission. The farmer watches. He is not sure he was right. The field is sure. It has been sure since the first insect came back.

What the developers don’t admit to
05/09/2026

What the developers don’t admit to

04/09/2026

Imagine this along Lord’s Lane , through the High Street and down Emgate!

This Solar farm in South Suffolk is roughly the same size as the Stell Solar Farm.The bit that hasn’t been addressed yet...
04/09/2026

This Solar farm in South Suffolk is roughly the same size as the Stell Solar Farm.

The bit that hasn’t been addressed yet is the disruption caused by the cable corridor.

Imagine something like this along South End, along Bedale High Street & down Emgate to the substation.

If that isn’t the route, then how is the electricity generated getting to the substation at Kirby Fleetham?

IF this development was to go ahead, it would have an enormous impact on local businesses, residents and visitors to the area.

Who benefits? The developers, their investors and the current landowner.

🚨 THIS ISN’T JUST A SOLAR FARM — OUR ROADS COULD BECOME CONSTRUCTION SITES

The proposed Easton & Letheringham solar farm is far bigger than rows of panels in fields.

To connect the development to the electricity network, a substantial underground cable route is proposed — including works along Framlingham Road, Hacheston Lane and through Hacheston.

And the scale of the proposed highway works should concern everyone who lives in or travels through our villages.

📍 A trench around 2 metres deep and 2 metres wide is proposed within the highway.

Think about what that means.

🚧 Roads potentially closed or severely restricted

🚗 Disruption to residents and access to homes

🚜 Difficulties for farm machinery and agricultural traffic

🚑 Questions about access for emergency services

🐴 Additional risks for cyclists, pedestrians and horse riders

🏗️ Heavy construction vehicles using our narrow rural roads

💥 Potential damage, settlement and deterioration of the road after reinstatement

💧 Potential impacts on drainage

🏛️ Construction works through and around sensitive historic areas, including the Easton Conservation Area

And these impacts aren't happening in isolation.

They need to be considered alongside the solar farm, battery storage, construction traffic and the wider grid connection works.

❗ WHERE ARE THE ANSWERS?

How many roads will actually be closed?

For how long?

What diversions will residents have to use?

How will people get to their homes?

How will emergency services get through?

What happens when farm machinery meets construction traffic on narrow rural roads?

What guarantees are there that our roads will be properly reinstated?

And what happens if the road starts failing months or years after the cable has been installed?

THIS IS OUR COMMUNITY — NOT AN INDUSTRIAL CORRIDOR

The impact of this development shouldn't be measured simply by looking at the solar panels once they're built.

We need to consider how the entire project will be constructed — and what that construction means for the people who live here.

Our villages, roads, heritage and countryside deserve proper protection.

Before this scheme goes any further, we need a full and transparent assessment of the impacts — not vague assurances.

📢 If you live in Easton, Letheringham, Hacheston or the surrounding villages, please share this post.

Make your voice heard. Ask questions. Object where you believe the impacts have not been properly addressed.

🛑 STOP THE EASTON & LETHERINGHAM SOLAR FARM

‼️Please note: the image attached to this post has been generated using AI

Six new passing places are being proposed along Lords Lane and 5 between Lords Lane and the old A1.Will complete road cl...
04/09/2026

Six new passing places are being proposed along Lords Lane and 5 between Lords Lane and the old A1.

Will complete road closures be on the cards here too?

All the bits they don’t admit to but which local communities are now becoming aware of.

The Grade 2 listed bridge at Middleham has just been closed indefinitely, due to damage by a lorry. Imagine if the same ...
04/09/2026

The Grade 2 listed bridge at Middleham has just been closed indefinitely, due to damage by a lorry.

Imagine if the same thing happened to the Grade 2 listed Flood Bridge between Exelby & Bedale. The road network is restricted to 7.5tonnes except for access, which of course the developers will claim allows them access to the solar farm site.

It doesn’t however mean that the bridge can take the weight of all the HGV traffic for a year.

Another good reason to object to the proposals and something else that the Consultants acting on be half of Enviromena, have conveniently skipped over

https://www.darlingtonandstocktontimes.co.uk/news/26523578.middleham-bridge-closed-hgv-strike-hours-tour-britain/?utm_medium=Social&utm_source=Facebook&fbclid=IwdGRleAUH3M5wZG9mAWZkaWQWUNxYQIdQ24QAF4BsNZ9LSNwUjCf2ymV4dG4DYWVtAjExAHNydGMGYXBwX2lkCjY2Mjg1NjgzNzkAAR7gWpDwtF6eqGmd31ut0iAiW3yPu1JSjIvyI700kFf_O7Qjg4gtHnfpUEwjAg_aem_qxTqpqC297q8Ab4Irot4Ag =1788533618

A North Yorkshire bridge has been closed indefinitely after being struck by a heavy goods vehicle just hours before the Tour of Britain cycle race…

The same is happening at the proposed Stell Solar Farm.
04/09/2026

The same is happening at the proposed Stell Solar Farm.

🚨 THE FARMER LOSES THE LAND. THE LANDOWNER GETS THE SOLAR DEAL.

We keep being told that “farmers are cashing in from solar.”

But what if the farmer DOESN’T own the land?

At Eden Farm in Old Malton, a farming family whose connection with the land stretches back to 1954 faces losing around 110 acres — almost half of its tenanted holding — to a 40-year solar development.

And this isn't simply campaign rhetoric.

The Planning Inspector found the scheme would cause “irreversible detriment” to an existing successful agricultural business.

The farmer opposed the development.

The council rejected it.

Yet the Government ultimately approved it.

And North Yorkshire Council's own planning report acknowledged that the longer-term economic benefits would accrue mainly to the landowner, while farming activity and the agricultural economy would suffer.

That destroys one of the easiest arguments used against those of us fighting industrial-scale solar:

“The farmers want it because they're making a fortune.”

Sometimes they aren't.

Sometimes the person receiving the solar deal and the person actually farming the land are two completely different people.

And there is another extraordinary dimension to this story.

The corporate freeholder identified by the farming family is Fitzwilliam Trust Corporation Ltd. Companies House records show that Helena Rees-Mogg, wife of Sir Jacob Rees-Mogg, is an active director of that company.

That does not prove that Sir Jacob owns the land, negotiated the solar agreement or receives income from it — and my article makes that distinction very clearly.

But given Sir Jacob's outspoken opposition to Net Zero, it is a corporate connection that deserves scrutiny and an explanation.

This case should make every MP, councillor and member of the public ask a very simple question the next time somebody says:

“Farmers are cashing in from solar.”

👉 Which farmer?

The person who owns the land?

Or the person whose family has spent generations actually farming it?

Because when tenant farmers lose their land, Britain doesn't simply lose acreage.

We lose farming businesses, food-producing capacity, family succession and another piece of our countryside.

Please read and share this investigation 👇

http://hopetosaveourcountryside.com/2026/09/03/the-farmer-loses-the-land-the-landowner-gets-the-solar-deal/

It will be interesting to see how this unfolds.
29/08/2026

It will be interesting to see how this unfolds.

Ok everyone, so I now have it in writing from Natural England that this work was done without a license. The council are also aware of this, along with the fact that the contractors entered the site via the Levedale Road access, which is also not approved.

This is now an active police investigation, and this crime can and does carry a custodial sentence if proven. Well, the fact that a licence had been applied for, but the work undertaken prior to it being granted, is proof enough for that, so it will be interesting to see who ends up in court over this now.

And I would also like to respond to one of the landowners, Mr Jones from Preston Hill Farm, who thinks it's ok to come on here and insult the 300,000 people now viewing and interacting with this page and the ongoing story as we are all NIMBYS that know nothing about the countryside or wildlife!

AT LEAST WE ARE NOT CRIMINALS MR JONES, DESTROYING BAGDER SETTS WITHOUT PERMISSION!

I would also like to point out that the council, Police, press, Natural England and over 300,000 other interested parties are also looking at your comments whilst also having proof that you are complicit in criminal activities so it may be better to keep your opinions to yourself.

26/08/2026

Further update about the badger set cover-up. Yesterday I had a long chat with Natural England about what I had witnessed and the site in general. They were very reluctant to tell me anything at all, apart from the fact that there was a record about Aura Power Ltd and the Preston Hill Farm site.

That said, when I told them the work was done last Wednesday, the tone of the conversation changed immediately, and I was advised to contact the police immediately and report it, which i have done.

This is now an active police investigation, and they will be attending the site and collecting photographic evidence from our team as well. Reading between the lines, I would say that an application may have been submitted but not actually approved; otherwise, Natural England would not be encouraging us to contact the police.

If it is actually proven that this work was undertaken without the proper licenses in place, then with all the interest in this page, we will try to take it to the national press and expose all the parties involved.

Watch this space, more updates coming soon

Address

Bedale

Alerts

Be the first to know and let us send you an email when Preserve Bedale's Beauty : Say No To Solar Sprawl posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The School

Send a message to Preserve Bedale's Beauty : Say No To Solar Sprawl:

Shortcuts

Share