Tesla Institute Of Technology

Tesla Institute Of Technology We Strive For Excellence!

Join our professional training program and gain practical skills in:Solar PV system designSolar panel installationBatter...
08/06/2026

Join our professional training program and gain practical skills in:
Solar PV system design
Solar panel installation
Battery and inverter connections
System testing and maintenance
Real-world practical exercises
πŸ“ Tesla Institute of Technology, Mekelle, Ethiopia
πŸ“ž +251 927 770 178
Register now and start your career in the solar energy industry!

A solar system installation typically involves designing and mounting a photovoltaic (PV) system that converts sunlight ...
01/06/2026

A solar system installation typically involves designing and mounting a photovoltaic (PV) system that converts sunlight into electricity for your home or business.

26/05/2026

Learn how to crimp and Install CCTV Camera at Tesla Institute Of Technology

What do you know about...Vehicle-to-Home (V2H) Technology?
26/05/2026

What do you know about...
Vehicle-to-Home (V2H) Technology?

17/05/2026

Rewinding an electric motor is a step-by-step process that involves removing the old, damaged copper windings from the motor's stator and replacing them with fresh wire.
​Because motors operate on precise electromagnetic principles, rewinding requires accuracy, patience, and the right tools. Here is a comprehensive guide to understanding how a standard AC induction motor is rewound.

α‰°αˆ΅αˆ‹ α‰΄αŠ­αŠ–αˆŽαŒ‚ αŠ’αŠ•αˆ΅α‰²α‰΅α‹©α‰΅αŠ£α‰₯ α‰΅αŠ«αˆαŠ“ αŠ₯αŠ“α‰°α‹αˆƒα‰‘ α‹αˆ­αŠ¨α‰‘ αŠ“α‹­ αˆ΅αˆαŒ αŠ“ α‹“α‹­αŠα‰³α‰΅1. αˆ΅αˆαŒ αŠ“ αˆ΅αˆ«αˆ•α‰² αŠ’αŠ•αˆ΅α‰³αˆŒαˆ½αŠ•2. αˆ΅αˆαŒ αŠ“ α‰΄αŠ­αŠ–αˆŽαŒ‚αŠ• αˆΆαα‰΅α‹Œαˆ«α‰΅αŠ•3. αˆ΅αˆαŒ αŠ“ α‹α‰°αˆαˆ‹αˆˆα‹© αŒ½αŒˆαŠ“α‰³α‰΅
12/05/2026

α‰°αˆ΅αˆ‹ α‰΄αŠ­αŠ–αˆŽαŒ‚ αŠ’αŠ•αˆ΅α‰²α‰΅α‹©α‰΅
ኣα‰₯ α‰΅αŠ«αˆαŠ“ αŠ₯αŠ“α‰°α‹αˆƒα‰‘ α‹αˆ­αŠ¨α‰‘ αŠ“α‹­ αˆ΅αˆαŒ αŠ“ α‹“α‹­αŠα‰³α‰΅
1. αˆ΅αˆαŒ αŠ“ αˆ΅αˆ«αˆ•α‰² αŠ’αŠ•αˆ΅α‰³αˆŒαˆ½αŠ•
2. αˆ΅αˆαŒ αŠ“ α‰΄αŠ­αŠ–αˆŽαŒ‚αŠ• αˆΆαα‰΅α‹Œαˆ«α‰΅αŠ•
3. αˆ΅αˆαŒ αŠ“ α‹α‰°αˆαˆ‹αˆˆα‹© αŒ½αŒˆαŠ“α‰³α‰΅

15th Round Building Electrical Installation Training is Started Workshop and Sites Based@Tesla Institute of Technology
24/03/2026

15th Round Building Electrical Installation Training is Started Workshop and Sites Based@Tesla Institute of Technology

15/03/2026

We are on Training, get connected with us!

Key Components and Wiring :Power Supply (3-Pin Plug): Provides line, neutral, and ground connections.Thermostat: A tempe...
04/03/2026

Key Components and Wiring :

Power Supply (3-Pin Plug): Provides line, neutral, and ground connections.

Thermostat: A temperature-controlled switch that interrupts the live wire to the compressor to regulate cooling.

Compressor & Relay: The motor, with terminals S (Start), R (Run), and C (Common), uses a relay to initiate the start winding.

Overload Protector (OLP): Wired in series, it cuts power to the compressor if it overheats or draws too much current.

Door Switch & Lamp: Controls the interior light based on door position.

Defrost Timer/System: Cycles the refrigerator between cooling and defrosting modes.

Address

Mekelle
7000

Website

Alerts

Be the first to know and let us send you an email when Tesla Institute Of Technology posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category