29/11/2025
🧱 Week 7 – Scaffold Tampering
Across construction sites, the same issues keep popping up:
• Hop-ups moved… then reinstalled without tie-bars
• Ties removed and left sitting loose on the deck
• Containment mesh pulled back beside stacked material
Scaffold structures are often used daily and need to be managed as such.
🔹 Before use – Scaffolds must be checked as fit for service during initial handover stages and following any alterations
🔹 During use – Consult directly with workers at scaffold areas in use regularly to ensure scaffolds remain safe and that unplanned alterations are identified and managed appropriately
🔹 After use – Inspect completed areas and ensure scaffolds remain in safe working condition ready for future use
If scaffolds aren’t controlled before, during, and after use, you’re leaving a major risk on site.