Technik Geodeta-PZS nr1 w Sieradzu

Technik Geodeta-PZS nr1 w Sieradzu

Share

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Technik Geodeta-PZS nr1 w Sieradzu, High School, .

09/06/2025
Photos from Technik Geodeta-PZS nr1 w Sieradzu's post 08/06/2025

Elo Integracja!:)

Photos from Technik Geodeta-PZS nr1 w Sieradzu's post 07/05/2025

Całkowity pomiar budynku dronem w 15 min? Nic prostszego:)😀😀😁

Photos from Honorowy Południk Krakowski's post 02/04/2025
27/03/2025

Dzisiaj z kolei przedstawiamy Wam - drodzy Ósmoklasiści, zawód technika geodety (nr zawodu 311104) 🏠🕍🛰

Posłuchajcie co mają do powiedzenia nasi geodeci na temat swojego kierunku
⬇️⬇️⬇️⬇️⬇️
https://youtu.be/AI-baRhbrxc
Szczegóły rekrutacji i opisy zwodów na stronie:
⬇️⬇️⬇️⬇️⬇️
https://mechaniksieradz.edu.pl/2019/11/06/rekrutacja/

Powiatowy Zespół Szkół nr 1 w Sieradzu
Mechanik Sieradz
Powiat Sieradzki

Photos from SKN Geodetów's post 24/03/2025

Absolwent technikum już na studiach!🙂Brawo👍

Photos from Technik Geodeta-PZS nr1 w Sieradzu's post 15/02/2025

Tyczenie budynku:)

15/02/2025

Zajęcia terenowe zimową porą:)

09/02/2025

https://www.facebook.com/share/1KE5B2VYjy/

🔹 THE 3-4-5 METHOD
✍️ is an essential technique in the construction and civil engineering fields to accurately trace right angles on construction sites. Based on the Pythagorean theorem, it guarantees the orthogonality of structures, ensuring their stability and proper alignment.

Application of the 3-4-5 method:

1. Measurement: Starting from an origin point, measure 3 units along a reference line and mark this point.

2. Second measurement: From the origin point, measure 4 units perpendicularly to the first line and mark this point.

3. Verification: Measure the distance between the two marked points; it should be 5 units. If this is the case, the angle formed is a right angle.

This method is particularly useful for laying foundations, aligning walls, and verifying the perpendicularity of structural elements. It is simple to implement and only requires basic tools such as a tape measure.

For a visual demonstration of this technique, you can refer to the following tutorial:

3-4-5 method for drawing a perpendicular in construction

By adopting the 3-4-5 method, construction and public works professionals can ensure the precision and quality of their projects, thus contributing to the durability and safety of infrastructures.

30/01/2025

Działania pozorowane:)))

29/01/2025

Po długiej, zimowej nauce w klasie, nareszcie zajęcia terenowe!:)
Zauważalny pełen profesjonalizm pomiarowych...:)

Want your school to be the top-listed School/college?